My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 12/03/2013
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2013
>
Agenda - Public Works Committee - 12/03/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:36:22 AM
Creation date
12/2/2013 9:55:33 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
12/03/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Program <br />City of Ramsey, Minnesota <br />Project # 14-STR-001 <br />Project Name Construct Center Street (COR) <br />Description <br />Construction of Center Street from East Town Center Drive to Sunwood Drive. <br />Justification <br />2014 thrti 2018 <br />Department <br />Contact <br />Type <br />Useful Life <br />Category <br />Priority <br />Status <br />Total Project Cost: <br />Street Improvements <br />Unassigned <br />Improvement <br />50 Years <br />Street Improvement <br />6-Planned <br />Active <br />$650,369 <br />This project will convert the gravel drive between East Town Center Drive and Sunwood Drive to a paved street. The street from Sunwood Drive <br />though the 1st block north will be permanent construction with curb, gutter, bituminous pavement and sidewalk. The street in the next block past <br />the pump house will be bituminous pavement with bituminous trail. The configuration of the streets to the west will be determined when that parcel <br />is developed. Using a temporary section past the pump house will provide a paved street while preserving future development opportunities for the <br />adjacent parcel. <br />Expenditures 2014 <br />Improvements Other than Build 650,369 <br />Total 650,369 <br />Funding Sources 2014 <br />Grants and Aids 650,369 <br />Total 650,369 <br />2015 2016 2017 2018 Total <br />650,369 <br />650,369 <br />2015 2016 2017 2018 Total <br />650,369 <br />650,369 <br />Revised 10/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.