|
Category
<br />Water Utility Improvement
<br />WM Looping: Alpine Dr. (CSAH 5 to Krypton St.)
<br />Renovate Pump House 2
<br />Complete Pump House 3
<br />The COR Bunker Lake Blvd (Armstrong - Ramsey Blvd)
<br />Water Treatment Plant Construction
<br />Watermain Looping: (Ramsey Blvd to Armstrong Blvd)
<br />1.5 MG Ground Storage Reservoir
<br />Well Rehabilitation & Pump Replacement
<br />River Pines Lift Station Water Connection
<br />Fire Station #1 Extension of Water
<br />Watermain Sunfish Lk Blvd
<br />REFURBISH WATER TOWER #2
<br />REFURBISH WATER TOWER #1
<br />PUMP HOUSE #1 BUILDING REPAIRS
<br />Water Utility Improvement Total
<br />GRAND TOTAL
<br />City of Ramsey, Minnesota
<br />Capital Improvement Program
<br />2014 thru 2018
<br />PROJECTS BY CATEGORY
<br />Project# Priority 2014 2015 2016 2017 2018 Total
<br />1
<br />04-WTR-001 6 100,000
<br />04-WTR-004 5
<br />04-WTR-005 6
<br />04-WTR-009 6
<br />04-WTR-017 6
<br />04-WTR-018 6 521,000
<br />05-WTR-004 6
<br />07-WTR-001 6 30,000
<br />08-WTR-003 6
<br />11-WTR-003 6 25,000
<br />12-WTR-001 6
<br />14-WTR-001 6
<br />14-WTR-002 6
<br />14-WTR-003 6 20,000
<br />100,000
<br />49,000 49,000
<br />60,000 60,000
<br />350,000 350,000
<br />9,700,000 8,700,000 18,400,000
<br />521,000
<br />2,000,000 2,000,000
<br />32,000 35,000 38,000 41,000 176,000
<br />20,000 20,000
<br />25,000
<br />350,000 350,000
<br />1,300,000 1,300,000
<br />1,300,000 1,300, 000
<br />20,000
<br />696,000 32,000 735,000 13,058,000 10,150,000 24,671,000
<br />696,000 32,000 735,000 13,058,000 10,150,000 24,671,000
<br />Revised 10/2012
<br />
|