My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 12/03/2013
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2013
>
Agenda - Public Works Committee - 12/03/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:36:22 AM
Creation date
12/2/2013 9:55:33 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
12/03/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Program 2014 thrti 2018 <br />City of Ramsey, Minnesota <br />Project # 07-WTR-001 <br />Project Name Well Rehabilitation & Pump Replacement <br />Description <br />Department Water Utility <br />Contact <br />Type Improvement <br />Useful Life 20 Years <br />Category Water Utility Improvement <br />Priority 6-Planned <br />Status Active <br />Total Project Cost: $328,000 <br />This program establishes a preventative maintenance schedule for the eight municipal wells which are the utilities sole water sources. The <br />following schedule is anticipated: 2012- Well #4; 2013- Well #3; 2014 - Well #5; 2015- Well #6; 2016 - Well #7; 2017- Well #8, 2018 - Well #1. <br />Justification <br />Well pumping is highly variable throughout the year. Regular maintenance during low pumping periods will minimize the possibility that a well <br />will be out of service during the peak demand period. The rehabilitation will update the control cabinets and install variable frequency drives on <br />wells 3 and 4. AVFP conserves energy and may be eligible for rebates. <br />Prior Expenditures 2014 2015 2016 2017 2018 Total <br />I 152,000 I Improvements Other than Build 30,000 32,000 35,000 38,000 41,000 176,000 <br />Total Total 30,000 32,000 35,000 38,000 41,000 176,000 <br />Prior Funding Sources 2014 2015 2016 2017 2018 Total <br />152,000 I Water Utility Fund 30,000 32,000 35,000 38,000 41,000 176,000 <br />Total Total 30,000 32,000 35,000 38,000 41,000 176,000 <br />Revised 10/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.