Laserfiche WebLink
.3 If a minor change in the Work is found necessary due to actual field conditions, the <br />Contractor shall submit detailed drawings of such departure for approval by the Architect <br />before making the change. <br />Add the following clauses as Paragraph 1.2.4: <br />.1 Whenever a product is specified in accordance with a Federal Specification, an ASTM <br />Standard, an American National Standards Institute Specification, or other Association <br />Standard, the Contractor shall present an affidavit from the manufacturer when requested by <br />the Architect or required in the Specifications, certifying that the product complies with the <br />particular Standard or Specification. When requested by the Architect or specified, support <br />test data shall be submitted to substantiate compliance. <br />.2 Whenever a product is specified or shown by describing proprietary items, model numbers, <br />catalog numbers, manufacturer, trade names, or similar reference, no substitutions may be <br />made unless accepted prior to execution of the Contract or if accepted as a change in the <br />Work in accordance with Paragraphs 3.4.2. When two or more products are shown or <br />specified, the Contractor has the option to use either of those shown or specified. <br />PARAGRAPH 3.2 <br />Add the following clauses to Paragraph 3.2.2: <br />.1 The exactness of grades, elevations, dimensions, or locations given on any Drawings issued <br />by the Architect, or the work installed by other contractors, is not guaranteed by the <br />Architect or the Owner. <br />.2 The Contractor shall, therefore, satisfy itself as to the accuracy of all grades, elevations, <br />dimensions and locations. In all cases of interconnection of its Work with existing or other <br />work, it shall verify at the site all dimensions relating to such existing or other work. Any <br />errors due to the Contractor's failure to so verify all such grades, elevations, locations or <br />dimensions shall be promptly rectified by the Contractor without any additional cost to the <br />Owner. <br />Add the following paragraphs to the end of Paragraph 3.2: <br />3.2.5 Except as to any reported errors, inconsistencies or omissions, and to concealed or unknown <br />conditions defined in Paragraph 4.3.6, by executing the Agreement, the Contractor represents the <br />following: <br />.1 The Contract Documents are sufficiently complete and detailed for the Contractor to (1) <br />perform the Work required to produce the results intended by the Contract Documents and <br />(2) comply with all the requirement of the Contract Documents. <br />.2 The Work required by the Contract Documents, including, without limitation, all <br />construction details, construction means, methods, procedures and techniques necessary to <br />perform the Work, use of materials, selection of equipment and requirements of product <br />manufacturers are consistent with: (1) good and sound practices within the construction <br />industry; (2) generally prevailing and accepted industry standards applicable to Work; (3) <br />requirements of any warranties applicable to the Work; and (4) all laws, ordinances, <br />regulations, rules and orders which bear upon the Contractor's performance of the Work. <br />SUPPLEMENTARY CONDITIONS <br />00800-2 <br />