My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/10/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 12/10/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:41:17 AM
Creation date
12/11/2013 10:22:34 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/10/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02100 <br />SITE PREPARATION <br />PART 1 - GENERAL <br />1.1 WORK INCLUDED <br />A. This Section includes all labor, materials, and equipment necessary for clearing <br />the site in preparation for earthwork and building construction. <br />B. The extent of site clearing is shown on the drawings. Site clearing work <br />includes, but is not limited to, the following: <br />1. Clearing the site and removing excess soil. <br />2. Removal of trees & stumps is by Owner. <br />PART 2 - EXECUTION <br />2.1 SITE CLEARING <br />A. Remove vegetation, improvements, or obstructions interfering with installation <br />of new construction. Removal includes stumps and roots. <br />2.2 DISPOSAL OF WASTE MATERIAL <br />A. Remove waste materials and unsuitable and excess topsoil from the Owner's <br />property and dispose of properly. <br />B. Clean up trash and debris caused by clearing operations under this Section, <br />keeping premises, parking lots and streets clean and neat at all times. <br />02100 - 1 <br />