My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/10/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 12/10/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:41:17 AM
Creation date
12/11/2013 10:22:34 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/10/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02220 <br />GRADING, EXCAVATING, <br />BACKFILLING, AND COMPACTING <br />PART 1- GENERAL <br />1.1 DESCRIPTION <br />A. Work included: Excavate, backfill, compact, and grade the site to the elevations <br />shown on the Drawings, as specified herein, and as needed to meet the <br />requirements of the construction shown in the Contract Documents. <br />1. Excavate, backfill & grade the site area designated on drawings. <br />B. Related work: <br />1. Documents affecting work of this Section include, but are not necessarily <br />limited to, General Conditions, Supplementary Conditions, and Sections in <br />Division 1 of these Specifications. <br />1.2 QUALITY ASSURANCE <br />A. Use adequate numbers of skilled workers who are thoroughly trained and <br />experienced in the necessary crafts and who are completely familiar with the <br />specified requirements and the methods needed for proper performance of the <br />work of this Section. <br />B. Use equipment adequate in size, capacity, and numbers to accomplish the work of <br />this Section in a timely manner. <br />C. In addition to complying with requirements of governmental agencies having <br />jurisdiction, comply with the directions of the soil engineer. <br />1.3 PRODUCT HANDLING <br />A. Comply with pertinent provisions of Section 01640. <br />PART 2 - PRODUCTS <br />2.1 SOIL MATERIALS <br />A. Fill and backfill materials: <br />02220 -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.