Laserfiche WebLink
a. First coat at 250 ft2/gal (6.25 m2/L). <br />b. Second coat at 350 ft2/gal (8.75 m2/L). <br />c. Follow manufacturer's recommendations for drying time between successive coats. <br />6. Remove defects and repolish defective areas. <br />7 Finish edges of floor finish adjoining other materials in a clean and sharp manner. <br />3.4 ADJUSTMENTS <br />A. Polish to higher gloss those areas not meeting specified gloss levels per mock-up. <br />B. Fill joints flush to surface. <br />3.5 FINAL CLEANING <br />A. Mechanically scrub treated floors for seven days with soft to medium pads with approved cleaning <br />solution. <br />B. Upon completion, General Contractor must remove surplus and excess materials, rubbish, tools and <br />equipment. <br />3.6 PROTECTION <br />A. Protect installed product from damage during construction <br />END OF SECTION <br />