Laserfiche WebLink
BID PACKS; <br />CONSTRUCTION MANAGER SHALL PROVIDE FOR ALL SUBCONTRACTOR USE - General building permit, <br />special inspections, testing, temporary sanitary facilities, waste disposal containers, ground snow <br />removal, temporary construction entrance, construction water source, office trailer, survey layout of <br />foundations and elevation, temporary heat after building is enclosed. <br />ALL SUBCONTRACT (S) TRADES SHALL PROVIDE — Drinking water, daily clean-up, waste removal to roll <br />off container, permits, fees and licensing if required, secure material storage, extension cords and all <br />necessary tools and equipment for a complete installation, roof and floor snow removal, temporary heat <br />and cover until building is enclosed for your work. <br />MATERIALS ONLY BIDS (M) — Shall include field measuring prior to fabrication, delivery to jobsite, <br />7.275% sales tax, material returns for unused material at 100% credit and free pick up or shipping. <br />02300 EARTHWORK (S) — Includes perimeter silt fence, catch basin protection, stripping sod and dispose <br />of offsite, strip and stockpiling topsoil (protect stockpile), cut and fill to subgrade, foundation <br />excavation, backfill and compaction, import and place 6" sand cushion for floor slabs, exterior slabs and <br />sidewalks, F & 110 mil vapor barrier, final grade topsoil to 6" depth minimum at +/- 1/10", remove <br />excess soils from site. <br />02500 UTILITIES (S) — Includes connect water line to existing waterline, provide curb stop, install <br />waterline into building mechanical room and provide valve, disinfect, test for bacteria. Connect sanitary <br />sewer from building foundation wall to drainfield connection. Underground bore beneath existing <br />parking lot. <br />02600 SEPTIC SYSTEM (S) — Includes percolation testing, design certification, stripping septic site, piping, <br />sand, rock, gravel, cover topsoil, seeding, holding tank, pump, disconnect, control box, alarm, shut-off, <br />testing and certification. <br />02900 LANDSCAPING (S) — Includes final preparation of all disturbed areas for sod, sod, water sod during <br />installation, provide 30 days maintenance of sod, including fertilizing and mowing. <br />03300 CONCRETE (S) — Includes concrete footings, reinforcing, floor slabs, stoop slab, exterior slabs and <br />sidewalks concrete sealer on exposed slabs. Provide alternate price for poured foundations, fireplace <br />foundation, stoop foundation, reinforcing, foundation insulation and heat and cover for foundation <br />construction. <br />03400 POLISHED CONCRETE (S) — Includes polishing and sealing concrete floors as shown on finish <br />schedule. Temporary power connection if required. <br />04200 MASONRY (S) — Includes stone veneer, mortar, precast sills, lintels and column caps, fireplace <br />hearth stone, water resistive barrier behind stone, flashing and weeps. Provide alternate price for <br />masonry foundations, fireplace foundation, stoops, reinforcing, core fill, bond beams, foundation <br />insulation and heat and cover for foundation construction. <br />