Laserfiche WebLink
In using the Bid Pack Breakdown Form the Contractor acknowledges that the form is not an all-inclusive list of <br />materials, products, labor, means, methods, and or techniques required for completion of the project. It is the <br />Contractors responsibility to include all required items necessary to deliver the completed project as outlined in <br />the project construction plans and specifications. In preparing a bid, fill in the bid category on this form that <br />you are bidding and attached it to Document 00300 — Bid/Sub Bid Form. <br />BID PACKS BREAKDOWN FORM <br />02300 EARTHWORK (S) <br />TOTAL $ <br />02500 UTILITIES (S) <br />TOTAL $ <br />02600 SEPTIC SYSTEM (S) <br />TOTAL $ <br />03300 CONCRETE (S) <br />TOTAL $ <br />03400 POLISHED CONCRETE (S) <br />TOTAL $ <br />04200 MASONRY (S) <br />TOTAL $ <br />05500 STEEL FABRICATION (M) <br />TOTAL $ <br />