My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/26/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 11/26/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:40:54 AM
Creation date
1/13/2014 9:12:39 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/26/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
924
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A permit for work within the county right of way is required and must be obtained prior to the <br />commencement of construction (Permit for Work Within ROW=$150.00). License Permit Bonding, <br />methods of construction, work zone traffic control, restoration requirements and follow-up inspections are <br />typical elements of the permitting process. Contact Terri Vaughan, Traffic Engineering Technician, at <br />763-862-4239; or Terri.Vaual7snC>,eonanoka.nin.us for further information regarding the permit process. <br />Thank you for the opportunity to comment. Feel free to contact me if you have any questions regarding this <br />review. <br />Sincerely, <br />Jane K. Rose <br />Traffic Engineering Manager <br />xc: File - CR 63/Plats+Developments/2013 <br />Randy Bettinger, Traffic Engineering Coordinator <br />Josie Scott, Traffic Engineering Technician <br />Terri Vaughan, Traffic Engineering Technician <br />Larry Hoium, County Surveyor <br />Gina Pizzo, Engineer III <br />
The URL can be used to link to this page
Your browser does not support the video tag.