Laserfiche WebLink
A permit for work within the county right of way is required and must be obtained prior to the <br />commencement of construction (Permit for Work Within ROW=$150.00). License Permit Bonding, <br />methods of construction, work zone traffic control, restoration requirements and follow-up inspections are <br />typical elements of the permitting process. Contact Terri Vaughan, Traffic Engineering Technician, at <br />763-862-4239; or Terri.Vaual7snC>,eonanoka.nin.us for further information regarding the permit process. <br />Thank you for the opportunity to comment. Feel free to contact me if you have any questions regarding this <br />review. <br />Sincerely, <br />Jane K. Rose <br />Traffic Engineering Manager <br />xc: File - CR 63/Plats+Developments/2013 <br />Randy Bettinger, Traffic Engineering Coordinator <br />Josie Scott, Traffic Engineering Technician <br />Terri Vaughan, Traffic Engineering Technician <br />Larry Hoium, County Surveyor <br />Gina Pizzo, Engineer III <br />