My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 12/19/2013
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2013
>
Agenda - Economic Development Authority - 12/19/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 12:25:21 PM
Creation date
1/16/2014 9:18:41 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
12/19/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EDA Updates 11082013 <br />(1) Expo Date <br />Move forward with determining April 19th or May 10th; based on availability at Fountains of Ramsey <br />(2) Old Municipal Center Site Development <br />Background <br />The City's Economic Development Authority (EDA) and Council are in the process considering the <br />future development of the "Old Municipal Center Site." The City is considering two general <br />development scenarios for the 20.5 acre site: (A) data center development and (B) residential <br />development. <br />Today, the Old Municipal Center Site is zoned Public/Quasi Public. On Tuesday, June 12, 2013 the <br />Council considered submitting an application to the Planning Commission to amend the City's <br />Comprehensive Plan to allow for either a data center or residential user. The Council decided to re- <br />engage surrounding property owners regarding a data center development before submitting a <br />Comprehensive Plan Amendment application to the Planning Commission; for either type of use. <br />On July 9, 2013 the City Council directed Staff to formulate a study group consisting of various <br />stakeholders; including: surrounding property owners, at large Ramsey residents, one Planning <br />Commission member, one Economic Development Authority member and one City Council <br />member. <br />The purpose of the Study Group is to better understand under what circumstances would a data <br />center development be an acceptable use for the Subject Property. The key outcome of this <br />process is a proposal for Council consideration; which will include (1) further <br />documentation/information addressing specific concerns (2) mitigation proposals addressing <br />specific concerns (3) updated site concept maps. <br />Update <br />The OMC study group met for the first time on Monday, November 4, 2013 to hold a scoping <br />meeting. The meeting began with introductions and a presentation by City staff —which, outlined <br />the history/ background of OMC site. At the conclusion of the presentation, the OMC study group <br />was asked to brainstorm topics (i.e. concerns) they would like to discuss moving forward —with the <br />intention of diving into each concern in detail at subsequent meetings. <br />A number of concerns/ topics were raised by the OMC study group during in the scoping meeting — <br />and, initial/ preliminary discussions and dialog took place. Topics included: Noise, <br />Aesthetics/Building Design, Property Values, Traffic, Safety and Electrical Field Hazards. A copy of <br />the written comments from the scoping meeting are attached for your review. <br />Based on consensus from the OMC study group, listed below is the proposed* meeting schedule: <br />a. Meeting 1: Noise (Monday, December 16, 6:00 p.m., Lake Itasca Room) —Update at EDA <br />mtg. <br />b. Meeting 2: Aesthetics/Building Design, Property Values <br />c. Meeting 3: Traffic, Safety, Electrical Field Hazards <br />
The URL can be used to link to this page
Your browser does not support the video tag.