Laserfiche WebLink
10. <br />I!1. <br /> <br /> 12. <br /> 13. <br /> <br /> 16. <br /> <br />i18. <br />19. <br />20. <br />21. <br />22. <br />23. <br />24. <br />25. <br />26. <br />27. <br /> 28. <br /> 29. <br /> 30. <br /> 31. <br /> 32. <br /> 33. <br /> 34. <br /> <br />2105.505 Muck Excavation 29,000 CY 22000 CY <br />2105.521 Granular Borrow (CV) 98,000 CY 30000 CY <br />2111.501 Test Rolling 95 RS 0 RS <br />2112.501 Subgrade Preparation 97 RS 0 RS <br />2211.501 Aggregate Base, Class 5 11,000 T 0 T <br />2331.504 Bit. Material for Mixture 285 T 0 T <br />2331.514 Base Course M/xture 5,150 T 0 T <br />2341.504 Bit. Material for Mixture 250 T 0 T <br />2341.508 Wearing Course ~ 3,800 T 0 T <br />2357.502 Bit. Mat. for Tack Coat 2,400 GAL 0 GAL <br />2531.501 Con. Curb & G~tter-B618 19,400 LF 0 LF <br />Spec. Concrete Valley Gutter 180 LF 0 LF <br />Spec. Triangular Valley Gutt~_r Sec. 4 FA 0 FA <br />2535.501 Bituminous Curb 300 LF 0 LF <br />2573.502 Silt Fence, Heavy Duty 3,650 LF 1550 LF <br />2575.501 Seeding 9 AC 0 AC <br />2575.502 Seed, Mixture 500 675 LB 0 LB <br />2575.505 Sodding, Type A 2,000 SY 0 SY <br />2575.511 Mulch Material, Type I 18 T 0 T <br />2575.519 Disk Anchoring 9 AC 0 AC <br />2575.531 Cc~m~. Fert., 20-10-10 2 T 0 T <br />Spec. Furnish & Install Stop Sign 5 EA 0 FA <br /> LF 0LF <br /> LF 0LF <br /> FA 0EA <br /> FA 0EA <br /> LB 0LB <br /> <br /> Spec. Centerline striping 9,400 <br /> Spec. Edge of Travel In. Striping 6" 18,500 <br /> Spec. Furn.&Inst. Right Turn Ln. Sign 4 <br /> Spec. Pave. Marking(Right Turn Arrow) 4 <br /> Spec. Traffic Control 1 <br />ITOTAL SCHEIIrLE "B": <br /> <br />ISCHEDUIE "C" - Ff~ITGATION WORK Estimated Used <br /> Item Quantity To Date <br /> <br /> $2.0o/~ <br /> $3.00 /CY <br /> $20.00 /RS <br /> $1oo.oo/~ <br /> $5.25 /T <br /> $17o.oo /T <br /> $10.00 /T <br /> $170.00 /T <br /> $11.5o /T <br /> $1.~0 /~n <br /> $4.00 /LF <br /> $9.00 /LF <br /> $325.00 /EA <br /> $5.25 /LF <br /> $2.00 /LF <br /> $225.00 /AC <br /> $2.00 /LB <br /> $1.5o/sY <br /> $11o.oo/~ <br /> $50.00 /AC <br /> $350.00 /T <br /> $110.00 <br /> $0.15 /LF <br /> $o.15/LF <br /> $11o.oo /E~ <br /> $50.00 /~ <br />$5, ooo. oo /is <br /> <br />$44,000.00 <br />$90,000.00 <br /> $o.oo <br /> $o.oo <br /> $o.oo <br /> $o.oo <br /> $o.oo <br /> $o.oo <br /> $o.oo <br /> $o.oo <br /> $o.oo <br /> $o.oo <br /> $o.oo <br /> $o.oo <br /> $3,100.00 <br /> $o.oo <br /> $o.oo <br /> $o.oo <br /> $o.oo <br /> $o.oo <br /> $o.oo <br /> $o.oo <br /> $o.oo <br /> $o.oo <br /> $o.oo <br /> $o.oo <br /> $o.oo <br /> <br />$214,420.00 <br /> <br />Extension <br /> <br />1. 2105.501 C~m~n Excavation 3500 CY 0 CY <br />2. Muck Excavation 10250 CY 0 CY <br /> 2105.505 <br />3. Spec. Seeding - Prairie Mix 4 AC 0 AC <br />4. Spec. Planting & Landscape 1 IS 0 IS <br />5. Spec. Supply&Install Wood Duck Boxes 4 EA 0 EA <br /> <br /> TOTAL SCHEDULE "C": <br />I STJMMAR¥: <br /> Total Schedule "A": <br /> Total Schedule "B": <br />ITotal Schedule "C": <br /> <br />II~ss 5% Retainage: <br /> <br /> WE RECOMMEND PARTIAL PAYMENT OF: <br />I Please verify the amount of previous payments, <br /> <br /> $3.00 /CY <br />$2.50/~ <br />$1,800.00 /AC <br />$15,000.00 /IS <br />$1oo.oo/~a <br /> <br />if any, prior to making payment. <br /> <br />$0.00 <br />$o.oo <br />$o.oo <br />$o.oo <br />$o.oo <br /> <br />$0.00 <br /> <br /> $2,140.00 <br />$214,420.00 <br /> $o.oo <br /> <br />$216,560.00 <br />$10,828.00 <br /> <br />$205,732.00 <br /> <br /> <br />