Laserfiche WebLink
46. <br /> <br />47. <br /> <br />48. <br /> <br />concerns, and to evaluate whether conditions of this CUP need <br />to be modified or procedural changes made. An initial <br />performance review shall occur within six months after <br />commencement of operations. <br /> <br />Drainage Easements. The Permit Holder shall provide a 20' <br />wide drainage and utility easement along the entire length of <br />the south property line. In addition, all drainage easements <br />necessary to direct surface water runoff off the Permit <br />Holder's property shall be Secured and recorded by the Permit <br />Holder prior to commencing improvements on the site. <br /> <br /> <br />