My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/09/1991
Ramsey
>
Public
>
Agendas
>
Council
>
1991
>
Agenda - Council - 07/09/1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 9:34:20 AM
Creation date
12/10/2003 10:40:02 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/09/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV. <br /> <br />ESTIMATED COSTS <br /> <br />The estimated project costs presented herein reflect the <br />construction costs and overhead costs. Construction costs are <br />estimated contract amounts for the actual construction. Right <br />of way costs were not included since it is proposed to utilize <br />dedicated rights of way. Overhead costs include, but are not <br />limited to, engineering, construction staking and inspection, <br />administrative service, legal, interest during construction <br />and contingency, overhead costs for the project are estimated <br />based on percentages of construction, cost. Those percentages <br />are estimated to be as follows: <br /> <br />- Engineering 8% <br />- Staking & Inspection 7% <br />- Bonding & Legal 2% <br />- City Staff Administration 5% <br />- Contingencies 2% <br />- Interest During Construction 6% <br /> <br />Interest during construction or capitalized interest was based <br />on a construction period of 9 months and an annual interest <br />rate of 8 percent. If the construction period is changed, <br />this cost will be adjusted. <br /> <br />The estimated cost of construction plus overhead are shown as <br />the estimated project cost. We have assumed that the streets <br />in the proposed plat will be cleared and graded prior to the <br />installation of the sanitary sewer and watermain. <br /> <br />The following Table I shows the estimated lateral costs for <br />the sanitary sewer, watermain, storm sewer and streets. <br /> <br /> TABLE I <br />SANITARY SEWER, WATERMAIN, <br />STORM SEWER AND STREETS <br />ESTIMATED LATERAL COSTS <br /> <br />Lateral <br />Benefit <br /> From <br /> Trunk <br /> <br />Total <br />Est. <br />Lateral <br /> Cost <br /> <br />Sewer <br />Water <br />Storm <br />Street & Trails <br />Parks <br />construction Costs: <br />Overhead 30% <br />Total Cost: <br /> <br />.$89,600 <br />96,800 <br />106,000 <br />161,800 <br />$20,000 <br />$474,200 <br />142,260 <br />$616,460 <br /> <br />$40,300 <br /> 36,600 <br /> <br /> 76,900 <br /> 23,070 <br />$99,970 <br /> <br />$129,900 <br />133,400 <br />106,000 <br />161,800 <br />20,000 <br />551,100 <br />165,330 <br />716,430 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.