My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/09/1991
Ramsey
>
Public
>
Agendas
>
Council
>
1991
>
Agenda - Council - 07/09/1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 9:34:20 AM
Creation date
12/10/2003 10:40:02 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/09/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br /> <br />IV. <br /> <br />ESTIMATED COSTS <br /> <br />The estimated project costs presented herein reflect the <br />construction costs and overhead costs. Construction costs are <br />estimated contract amounts for the actual construction. Right <br />of way costs were not included since it is proposed to utilize <br />dedicated rights of way. Overhead costs include, but are not <br />limited to, engineering, construction staking and inspection, <br />administrative service, legal, interest during construction <br />and contingency. Overhead costs for the project are estimated <br />based on percentages of construction cost. Those percentages <br />are estimated to be as follows: <br /> <br />- Engineering 8% <br />- Staking & Inspection 7% <br />- Bonding & Legal 2% <br />- City Staff Administration 5% <br />- Contingencies & Easements 2% <br />- Interest During Construction 6% <br /> <br />Interest during construction or capitalized interest was based <br />on a construction period of 9 months and an annual interest <br />rate of 8 percent. If the construction period is changed, <br />this cost will be adjusted. <br /> <br />The estimated cost of construction plus overhead are shown as <br />the estimated project cost. We have assumed that the streets <br />in the proposed plat will be cleared and graded prior to the <br />installation of the sanitary sewer and watermain. <br /> <br />The following Table I shows the estimated lateral costs for <br />the sanitary sewer, watermain, storm sewer and streets. <br /> <br /> TABLE I <br />SANITARY SEWER, WATERMAIN, STORM SEWER AND STREETS <br />ESTIMATED LATERAL COSTS <br /> <br /> Est. Lateral <br /> Benefit Total <br />Estimated From' Estimated <br />Lateral Existing Lateral <br />Costs Trunk Costs <br /> <br />Sewer <br />Water <br />Storm <br />Street <br />Parks (114 lots x <br /> 200 per lot) <br />Construction Costs: <br />Overhead 30% <br />Total Cost: <br /> <br />$117,400 $25,800 $143,200 <br />105,000 $35,900 140,900 <br />50,100 -- 50,100 <br />163,000 -- 163,000 <br /> <br />22,800 -- 22,800 <br />$458,300 $61,700 $520,000 <br />137,500 18,500 156.,000 <br />$595,800 $80,200 $676,000 <br /> <br />4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.