Laserfiche WebLink
1991 STREET CRACK FILLING PROGRAM <br /> CHANGE ORDER NO. 1 <br /> <br />Date: <br />Project No.: <br />Award Date: <br />Completion Date: <br /> <br />June 17, 1991 <br />91-02, 91-03,91-04, 91-05,91-06,91-07, 91-09 <br />April25,1991 <br />June 19, 1991 <br /> <br />Notice of Change: <br /> <br />The contract amount for the 1991 Street Crack Filling Program was <br />based upon an estimated poundage of crack sealing materials. <br />Several projects required more than the estimated amount while <br />others required tess. <br /> <br />Justification of Change: <br /> <br />The contract was bid on a unit price per pound of material applied. <br />The total amount of material applied to the streets was verified by the <br />project inspector. The contractor should be compensated for the <br />actual amount of material placed at the unit price bid. <br /> <br />Summary of Cost Change: <br /> <br /> Estimated <br /> <br /> I2,870 lbs <br /> <br />Actual Unit Net Contract <br />Ouanri .ty Price Change <br /> <br />14,870 lbs. $0.913b $ 1,820.00 <br /> <br />Previous Contract Amount <br /> <br />11,711.70 <br /> <br />New Contract Amount <br /> <br />13,531.70 <br /> <br />Accepted by: <br />Co01n'hctor <br /> <br />Date <br /> <br />City of Ramsey <br /> <br />Date <br /> <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />i <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />