Laserfiche WebLink
I <br /> I <br /> I <br /> I <br /> I <br /> I <br />,I <br /> I <br /> <br />612-7844)657 <br /> <br />GLENN REHBEIN EXCAVATING, INC. <br /> LEGAL DEPARTMENT <br /> 7309 LAKE DRIVE <br /> LIND LAKES. MN 55014 <br /> <br />JEFFREYL. KNUTSON <br />GENERAL COUNSEL <br /> <br />15 July, 1991 <br /> <br />STEVE JANKOWSKI <br />City Engineer <br />City of Ramsey <br />15153 Nowthen Blvd, NW <br />Ramsey, MN 55303 <br /> <br />Reference: <br /> <br />Site Plan <br />Northfork Golf Maintenance Facility <br /> <br />Dear Mr. Jankowski" <br /> <br />This letter is to respond to your comments of July 11, 1991. We have <br />revised the site plan to address.your concerns and have also included <br />an overall view of the building site as it would appear on the <br />approved drainage plan. Specifically, please note the following: <br /> <br />1. A directional arrow has been added. <br /> <br />The property line for Burlington Northern has been located <br />along with the overhead power lines. <br /> <br />3. Curb and gutter are shown on the front of the building. <br /> <br />We have not made any changes in the gravel work area for the mainten- <br />ance building. We simply don't see the need to have a bituminous <br />surface for tractors and lawn equipment to use. Remember this is <br />not a facility open to the public. We have also not designated the <br />exact type and size of plantings along the front of the building. We <br />have not prepared this because we intend to remain consistent with <br />any work done on the clubhouse and, as of yet, we have not hired a <br />landscape architect. The City can be assured however, that the <br />front of the building will be landscaped to provide an attractive <br />maintenance facility. <br /> <br />Finally, the exterior plan submitted to you should show stucco only <br />on the south and east side of the building. My understanding is <br />that this is consistent with City code. And, as I indicated in a <br />phone conversation with Sylvia, we do not intend to stucco the <br />building until next spring when it can be done at the same time as <br />the clubhouse. This will ensure uniformity in color, texture and <br />application. <br /> <br /> <br />