My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 02/11/2014
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2014
>
Agenda - Council Work Session - 02/11/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:17:27 PM
Creation date
2/12/2014 12:36:31 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
02/11/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wall Surface Finish Matrix <br />CO <br />4) <br />N <br />J <br />FF <br />FF <br />FF <br />FF <br />FF <br />FF <br />FF <br />FF <br />FF <br />Level 2 <br />PF <br />PF <br />PF <br />PF <br />FF <br />PF <br />PF <br />FF <br />FF <br />Level 1 <br />NF <br />NF <br />NF <br />NF <br />NF <br />NF <br />NF <br />NF <br />NF <br />Bridge 2007 <br />Bridge 2586 <br />Q <br />Wall B <br />Wall C <br />Wall D <br />Wall E <br />Wall F <br />Wall G <br />Totals <br />$ 39,400 <br />O <br />O <br />CO <br />O) <br />CO <br />O <br />O <br />CO <br />O) <br />$ 292,600 <br />O <br />O <br />CO <br />CO- <br />LO <br />O <br />O <br />O) <br />O) <br />O <br />O <br />N <br />N <br />CD <br />$ 158,000 <br />$ 86,400 <br />$ 1,112,700 <br />Level 3 <br />Bridge 2007 <br />Bridge 2586 <br />Q <br />ca <br />Wall B <br />WaII C <br />Wall D <br />Wall E <br />Wall F <br />Ts <br />H <br />M <br />N <br />J <br />Totals <br />$ 39,400 <br />$ 136,300 <br />$ 48,200 <br />$ 108,500 <br />$ 55,800 <br />CD <br />O <br />CO <br />$ 27,700 <br />$ 146,800 <br />$ 83,400 <br />$ 649,800 <br />Level 2 <br />Bridge 2007 <br />Bridge 2586 <br />Q <br />CCS <br />Wall B <br />WaII C <br />Wall D <br />Wall E <br />Wall F <br />TES <br />H <br />N <br />) <br />N <br />J <br />Totals <br />$ 20,000 <br />$ 24,300 <br />$ 42,200 <br />$ 80,600 <br />O <br />O <br />CO- <br />O <br />O <br />CO <br />C") <br />$ 23,100 <br />$ 42,800 <br />$ 22,500 <br />$ 267,800 <br />Level 1 ("Base") <br />Bridge 2007 <br />Bridge 2586 <br />Q <br />CCS <br />Wall B <br />Wall C <br />Wall D <br />Wall E <br />Wall F <br />TES <br />4) <br />N <br />J <br />O <br />O) <br />CO <br />Increment above Level 2 $ <br />O <br />O <br />CO <br />M <br />Increment above Level 1 $ <br />Level 3 Concept Overview <br />Level 2 Concept Overview <br />Level 1 Concept Overview <br />Brick pilasters using real "thin brick" <br />Brick pilasters using formliner <br />Architectural reveals/lines possible <br />Single -color finish on all other concrete surfaces <br />No formliner textures on remainder of wall area <br />No formliner textures <br />Picket railing (6" picket spacing) <br />Single -color finish on all concrete surfaces <br />Single -color finish on all other concrete surfaces <br />Picket railing (6" picket spacing) <br />
The URL can be used to link to this page
Your browser does not support the video tag.