Laserfiche WebLink
10. <br /> <br />13. <br /> <br />11. <br /> <br />12. <br /> <br />disposal by fire must also manage air quality impact and smoke nuisance to adjoining <br />property owners as well as fire safety concerns. <br /> <br />g) <br /> <br />Whole trees may not be disposed of by buming. Trunks and limbs larger than six (6) <br />inches in diameter must be salvaged for lumber, firewood, chipped or hauled to a <br />licensed wood disposal site. Application may be made for an open burning permit to <br />dispose of brush less than six (6) inches in diameter and stumps with less than four <br />feet of main trunks attached. The location of the proposed open bum site will be <br />specified by the CITY. Wood disposal by burning requires whole tree volume <br />reduction, proposed site inspection prior to clearing and an open burning permit. <br />Residual ash and unburned stumpage may be buried on the site at the approval of the <br />CITY. Chipped material may be applied and utilized on site to mitigate root damage <br />from grade changes or used in the right-of-way for erosion control and top soil <br />restoration. <br /> <br />SECTION IV <br />GENERAL <br /> <br />Dumping of Garbage. The DEVELOPERS shall adhere to Section 5.11 of the Ramsey <br />City Code, which section Regulates the Dumping of Garbage, Site Development and <br />Construction Debris. <br /> <br />Reimbursement to City. The DEVELOPERS agree to reimburse the CITY for all <br />costs incurred by the CITY in defense or enforcement of this Agreement, or any portion <br />thereof, including court costs and reasonable engineering and attorney's fees. Said <br />expenses shall be paid within fifteen (15) days of billing by the CITY and failure to pay <br />the CITY'S expenses within the fifteen (15) day billing period will permit the CITY to <br />draw upon any of the escrows required by this Agreement for payment. <br /> <br />Future Road Easement. The DEVELOPER shall record a 66-foot road easement along <br />the northern lot line of Lot 1 for future extension of 161~t Lane NW. The CITY will <br />utilize the road easement under the following conditions: <br /> a) If the property to the west is developed and the CITY determines if it is in the <br /> public interest to extend 161st Lane to the west. <br /> b) If Lots 1 and 2, Block 1, either together or individually, are resubdivided to <br /> urban densities, the City may require the use of the easement for public road <br /> purposes. <br /> <br />Plat Expense Reimbursement. The DEVELOPERS agree that they will pay to the <br />CITY out of any of the escrows required herein, all CITY expenses incurred in approval <br />of the Plat, including, but not limited to administration expenses, engineering and legal <br />fees. Said expenses shall be paid within fifteen (15) days of billing by the CITY and <br />outstanding billings shall be paid prior to recording of the Final Plat. Any expenses <br />incurred after recording of the Final Plat shall also be paid within said fifteen (15) day <br />billing period. Failure to pay the CITY'S expenses within the fifteen (15) day billing <br /> <br />Development Agreement: Trappers Ridge <br /> Page 5 of 7 <br /> <br /> <br />