Laserfiche WebLink
Pay ESTIMATE #8 <br /> <br /> CITY OF RAMSEY <br /> SUNWOOD DRIVE NW <br />UTILITY AND STREET IMPROVEMENTS <br />IMPROVEMENT PROJECT NO. 99-52 <br /> <br />Bid Schedule "B" - Ramsey Local Funding <br /> <br /> Estimated Contract <br />Item Description Quantity Contract Unit Price Amount Used to Dar( Extension <br /> <br /> 1 6" Ductile Iron Pipe Sewer CI 52 508 LF $15.70 LF $ 7,975.60 506 $ 7,944.20 <br /> 2 12" Ductile Iron Pipe Sewer Cl 52 2585 LF $24.70 LF $ 63,849.50 2600 $ 64,220.00 <br /> 316'' SDR 26 PVC Pipe (All Depths) 319 LF $8.50 LF $ 2,711.50 319 $ 2,711.50 <br /> 4 8" SDR 35 PVC Pipe (All Depths) 1643 LF $13.80 LF $ 22,673.40 1643 $ 22,673.40 <br /> 5[8" X 6" PVC Wye - SDR 26 7 EACH $58.00 EACH <br /> $ <br /> 406.00 <br /> 7 <br /> $ <br /> 406.00 <br /> 6,6" PVC Plug 7 EACH $12.60 EACH $ 88.20 7 $ 88.20 <br /> <br /> 7 8" PVC Plug 2 EACH $23.70 EACH $ 47.40 2 $ 47.40 <br /> 8 Sanitary Sewer Inspection 1595 LF $1.00 LF $ 1,595.00 1595 $ 1,595.00 <br /> 9 Ductile Iron Fittings 6880 LB $1.20 LB $ 8,256.00 4113 $ 4,935.60 <br /> <br /> 10 Relocate Hydrant _. 1 EACH $1,632.10 EACH $ 1,632.10 1 $ 1,632.10 <br /> <br /> 11 Connect to Existing Watermain 2 EACH $1,961.30 EACH $ 3,922.60 2 $ 3,922.60 <br /> 12 Hydrant 5 EACH $1,599.90 EACH $ 7,999.50 5 $ 7,999.50 <br /> 13 6" Gate Valve and Box 13 ! EACH $489.60 EACH $ 6,364.80 13 $ 6,364.80 <br /> 14 10" Gate Valve and Box 1 EACH $950.00 EACH $ 950.00 2 $ 1,900.00 <br /> 15 12" Gate Valve and Box 4 EACH $1,164.80 EACH $ 4,659.20 4 $ 4,659.20 <br /> 16 6" Polystyrene Insulation 10.7 SY $18.30 SY $ 195.81 11 $ 201.30 <br /> 171Castin9 Assemblies T..ype 2 8 EACH $419.30 EACH $ 3,354.40 8 $ 3,354.40 <br /> I <br /> 181Construct Sanitary Manhole 8 EACH $1,217.90 EACH $ 9,743.20 8 $ 9,743.20 <br /> <br /> 19 Extra Depth Manhole (over 8') 37.62 LF $83.00 LF $ 3,122.46 37.62 $ 3,122.46 <br /> <br />Total Bid Schedule "B" - Ramsey Local Funding <br /> <br />$ ]49,546.6? $ 147,520.86 <br /> <br />Bid Schedule "C" - Mobilization and Traffic Control <br />Item Description <br /> <br />1 Mobilization <br /> <br />2 Traff c Control <br /> <br />Total Bid Schedule "C" - Mobilization and Traffic Control <br /> <br />Estimated Contract <br />Quantity Contract Unit Price Amount <br /> <br />1 LS 1521,461.00 LS $ 21,461.00 <br />1 LS ] $2,000.00 LS $ 2,000.00 <br /> <br />Used to Date Extension <br /> <br />11 $ 21,461.00I <br />1 $ 2,000.00 <br /> <br />$ 23,461.00 <br /> <br />$ 23,461.00 <br /> <br />sba[ed docslmuntcipallar amse¥13156/a~dProposalForm.xls <br />Sheet: Pay Esl~male 8 Final 3 <br /> <br /> <br />