My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/25/2014
Ramsey
>
Public
>
Agendas
>
Council
>
2014
>
Agenda - Council - 03/25/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:18:14 PM
Creation date
3/26/2014 8:53:30 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/25/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Elements and Estimate of Construction Costs <br />Fill out the scoping sheet below or attach the worksheet Appendix U and provide the cost <br />estimate for each element. You may add additional eligible costs (construction costs) that are not <br />accounted for in the blank spaces at the bottom of the table. Applicants may instead use the more <br />exhaustive checklist of the Mn/DOT scoping sheet in lieu of this checklist. The total cost should <br />match the total cost reported for the project. Please use 2011 cost estimates, the TAB may apply <br />an inflation factor to awarded projects. <br />CONSTRUCTION PROJECT ELEMENTS/COST ESTIMATES <br />Check all that <br />apply <br />ITEM <br />COST <br />►� <br />Mobilization (approx. 5% of total cost) <br />$72,845 <br />0 <br />Removals (approx. 5% of total cost) <br />$72,845 <br />❑ <br />Roadway (grading, borrow, etc.) <br />$ <br />❑ <br />Roadway (aggregates and paving) <br />$ <br />❑ <br />Subgrade Correction (muck) <br />$ <br />0 <br />Storm Sewer <br />$58,650 <br />❑ <br />Ponds <br />$ <br />❑ <br />Concrete Items (curb & gutter, sidewalks, median <br />barriers) <br />$ <br />❑ <br />Pedestrian Curb Ramps (ADA) <br />$ <br />0 <br />Path/Trail Construction <br />$763,180 <br />0 <br />Traffic Control <br />$19,000 <br />0 <br />Striping <br />$4,000 <br />0 <br />Signing <br />$3,650 <br />❑ <br />Lighting <br />$ <br />►� <br />Turf - Erosion & Landscaping <br />$103,340 <br />❑ <br />Bridge <br />$ <br />►� <br />Retaining Walls <br />$104,400 <br />❑ <br />Noise Wall <br />$ <br />❑ <br />Traffic Signals <br />$ <br />❑ <br />Wetland Mitigation <br />$ <br />❑ <br />Other Natural and Cultural Resource Protection <br />$ <br />❑ <br />RR Crossing <br />$ <br />❑ <br />$ <br />0 <br />Trail Signage: Wayfinding/Interpretive <br />$20,000 <br />0 <br />Trail Amenities (bumpout, bench, etc.) <br />$45,000 <br />❑ <br />$ <br />❑ <br />$ <br />❑ <br />$ <br />►� <br />Contingencies <br />$190,000 <br />TOTAL CONSTRUCTION COST <br />$1,456,910 <br />
The URL can be used to link to this page
Your browser does not support the video tag.