My WebLink
|
Help
|
About
|
Sign Out
Home
03/27/14
Ramsey
>
Weekly Update
>
2010-2019
>
2014
>
03/27/14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2014 9:01:22 AM
Creation date
3/27/2014 4:02:48 PM
Metadata
Fields
Template:
Weekly Update
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2015 <br />Project Title: <br />Location: <br />Contact: <br />Cost: <br />Description: <br />Mississippi Skyway, Part 2 <br />Ramsey (Ramsey emerging node) <br />Mark Riverblood, City of Ramsey <br />$2,400,000 total (requesting $240,000) <br />The Mississippi Skyway will be the northern -most nexus of alternative transportation in <br />the MISS, connecting Metro Transit's Northstar Commuter Rail and bus service in <br />Ramsey to the MRT in Mississippi West Regional Park, both on the other side of US <br />Highway 10 and 169. The 210 -foot foot Skyway will be a covered structure at either 10- <br />or 12 -foot interior width. It will directly connect to the future MRT extension, to be <br />completed in 2014, The ideal timing for construction of the Skyway is 2016, but funding <br />would need to be in place by 2015. The Skyway funding match would be from the <br />Cooperative Agreement identified as Phase 5 of the Metropolitan Council's approval for <br />the above named Regional Park. This project, once completed would establish Ramsey <br />as a fully - fledged ATS Node by providing a safe crossing over the highway to the MISS. <br />Fire Department. The Fire Department responded to City of Anoka on Saturday morning to assist <br />with apartment fire. Anoka/Champlin command requested the Ramsey Ladder Truck for roof -top <br />ventilation. Crews were on the scene for about 2 -3 hours. <br />Public Works Activities. The utility department responded to 4 more frozen water services <br />bringing our total to 31 for the winter. They also responded to a frozen sanitary sewer line that <br />services NAU insurance company located in the COR. Fortunately, the line was cleared before <br />any damage occurred to the business. The street department has started street sweeping and will <br />continue for the next several weeks. There is more debris on the road than in past years because <br />of the amount of sand that was used this year. Sand is used in extreme cold, when salt is becomes <br />less effective. Sand was also used more this year when agencies began to run short on salt and <br />needed to stretch their supplies to make the end of the season. <br />
The URL can be used to link to this page
Your browser does not support the video tag.