My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/22/2014
Ramsey
>
Public
>
Agendas
>
Council
>
2014
>
Agenda - Council - 04/22/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:18:49 PM
Creation date
4/23/2014 11:19:09 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/22/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our Mission: Toworktogethertoresponsilygrow ourconemunityand toproviIt quality,cost-effective, and of&cientgovernmentseivices <br />CC Regular Session <br />Meeting Date: 04/22/2014 <br />By: Bruce Westby, Engineering/Public Works <br />Information <br />7.3. <br />Title: <br />Consideration of Adopting Resolution 14-04-076 Accepting Bids and Authorizing Award of Contract for IP 14-00; 2014 Street Maintenance Program. <br />Purpose/Background: <br />The purpose of this case is to accept bids and award a contract(s) for Improvement Project 14-00; 2014 Street Maintenance Program (SMP). <br />As part of the City's ongoing SMP, numerous segments of paved streets receive crack -sealing, sealcoating and/or overlay improvements each year to help extend <br />the life of City streets. The benefits of these improvement projects are as follows: <br />• Crack -sealing - Seals existing cracks one -quarter of an inch or more in width with hot rubberized asphalt to extend pavement life. This prevents <br />stormwater runoff from infiltrating through the pavement and into the underlying subgrade. As stormwater runoff enters pavement through cracks it can <br />wash finer aggregate particles to the bottom of the aggregate base creating voids over time. Then as water accumulates in the underlying subgrade, frost <br />heaving can occur during cold -weather months, further damaging the pavement. <br />• Sealcoating - Protects and preserves bituminous pavement by sealing the surface to protect it from the negative effects of the sun, stormwater runoff, and <br />other petroleum products that are deposited on the pavement over time by vehicles. <br />• Overlays - Strengthens the pavement section by restoring a portion of the structural integrity of the pavement, while also helping to prevent moisture <br />intrusion. <br />As in previous years, staff from the Engineering and Public Works Departments prepared plans and specifications in-house for the 2014 SMP. This year's <br />program includes approximately 14 miles of streets throughout the city. Street segments that are proposed to be crack -sealed and/or sealcoated are identified in <br />the plans and specifications as "Division A" improvements. See attached Maps A through J for specific street segments included in Division A. The segment of <br />Sunwood Drive approximately one -quarter mile in length to the west of Nowthen Boulevard (CSAH 5) is proposed to receive an overlay under the "Division B" <br />improvements as shown in the plans and specifications and on attached Map K. <br />On March 25, 2014, the City Council accepted plans and specifications and authorized advertisements for bids for IP 14-00, 2014 Street Maintenance Program. <br />Copies of the bid plans and specifications will be available for review at the Council meeting. <br />If a contract(s) is awarded for this project, all work shall be completed by August 1, 2014. <br />Notification: <br />Advertisements for bids for the 2014 Street Maintenance Program were published in the Anoka County Union and in Finance and Commerce on March 28th, <br />April 4th, and April l lth. Plans and Specifications were also posted on QuestCDN for bidding purposes. <br />Observations/Alternatives: <br />Bids were publicly opened and read aloud at 10 am on Friday, April 18, 2014. All bids were then checked for errors and omissions. A tabulation of the bid <br />results is included below as well as in attached Resolution 14-04-076. The bids received were well under the engineer's estimates for both Divisions A and B. <br />As such there could be an opportunity to complete additional street maintenance projects on other street segments in 2014 with Council approval. <br />TOTAL TOTAL <br />CONTRACTOR DIVISION A DIVISION B <br />BID BID <br />Allied Blacktop Co. <br />$249,468.16 <br />No Bid Submitted <br />ASTECH Corp. <br />$275,621.14 <br />$69,910.50 <br />Hardrives Inc. <br />No Bid Submitted <br />$77,587.85 <br />North Valley, Inc. <br />No Bid Submitted <br />$62,692.90 <br />Omann Bros. Paving, Inc. <br />No Bid Submitted <br />$59,046.35 <br />Pearson Bros., Inc. <br />$268,907.26 <br />No Bid Submitted <br />Engineer's Estimate <br />$343,373.00 <br />$81,200.50 <br />Funding Source: <br />The 2014 budget includes $500,000 in the Street Maintenance Fund (within the general fund) for the 2014 Street Maintenance Program, including both Division <br />A and B improvements. If funds remain after the 2014 Street Maintenance Program is complete, the remaining funds can be applied toward the maintenance of <br />other streets in 2014 as approved by Council. <br />Recommendation: <br />
The URL can be used to link to this page
Your browser does not support the video tag.