My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/13/2014
Ramsey
>
Public
>
Agendas
>
Council
>
2014
>
Agenda - Council - 05/13/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:19:09 PM
Creation date
5/14/2014 3:59:03 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/13/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41 INDIVIDUAL SUBSURFACE SEWAGE TREATMENT SYSTEMS 7080.2100 <br />1 <br />Pipe diameter in inches <br />1.25 1.5 2 3 <br />Perforation spacing <br />in feet <br />2 12 18 26 46 87 <br />2.5 12 17 24 40 80 <br />3 12 16 22 37 75 <br />1 <br />1/8 inch holes <br />Pipe diameter in inches <br />1.25 1.5 2 3 <br />Perforation spacing <br />in feet <br />2 21 33 44 74 149 <br />2.5 20 30 41 69 135 <br />3 20 29 38 64 128 <br />F. Perforation holes must be drilled straight into the pipe and not at an angle. Pressurized <br />distribution laterals must be installed level. Perforation holes must be free of burrs. Holes must be spaced <br />no more than three feet apart. A method to introduce air into the pipe after dosing must be provided. The <br />pipes must completely drain after the pump turns off. <br />G. Pressure distribution laterals must be spaced no further than 36 inches apart in seepage beds <br />and mound absorption beds, and no further than 24 inches from the outside edge of the bed. <br />H. Pressure distribution laterals must be connected to a header or manifold pipe that is of a <br />diameter such that the friction loss in the header or manifold will be no greater than five percent of the <br />average head at the perforations. The header or manifold pipe must be connected to the supply pipe from <br />the pump. <br />1. Perforated laterals must not be installed closer than 12 inches from the edges of the absorption <br />bed and perforated laterals must terminate no closer than 12 inches from the ends of the absorption bed. <br />J. Pressure distribution pipe cleanouts must be provided to check the system for proper <br />operation and cleaning of plugged perforations. Cleanouts must be accessible from final grade. <br />Statutory Authority: MS s 115.03; 115.55 <br />History: 32 SR 1347; 35 SR 1353; 38 SR 1001 <br />Published Electronically: January 22, 2014 <br />7080.2100 DOSING OF EFFLUENT. <br />Subpart 1. General. When pumping or dosing is necessary, it must comply with this part. <br />Copyright ©2014 by the Rev <br />so <br />of Statutes, State of Minnesota. All Rights Reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.