Laserfiche WebLink
7083.0760 SSTS CREDENTIALING AND PRODUCT REGISTRATION 8 <br />systems, verify the submittal of management plans, and issue written certificates of compliance and notices <br />of noncompliance for systems described in part 7083.0740, subpart 1, item B. <br />Subp. 2. Responsibilities. Basic and advanced inspection licensees must submit a completed version <br />of the agency's existing inspection form to the local unit of government and the property owner within 15 <br />days after any existing system compliance inspection. <br />Subp. 3. Certified inspectors. Certified inspectors are responsible for personally conducting the <br />necessary procedures to assess system compliance. Certified inspectors must complete and sign the agency's <br />existing system inspection form. <br />Statutory Authority: MS s 115.03; 115.55 <br />History: 32 SR 1420; 35 SR 1353 <br />Published Electronically: March 11, 2011 <br />7083.0760 INSTALLATION LICENSE. <br />Subpart 1. Authorization. A licensed installation business is authorized to construct, install, alter, <br />extend, maintain, or repair all SSTS according to an approved design. <br />Subp. 2. Responsibilities. Installation licensees must: <br />A. ensure all work is done according to an approved design report; <br />B. notify the local unit of government when work is in need of required inspections; <br />C. provide as -built drawings to the owner and local unit of government within 30 days of <br />system installation; <br />D. maintain quality control and quality assurance records for five years; <br />E. provide system owners with information concerning system operation and maintenance; <br />F. ensure that all construction activities comply with applicable storm water regulations; <br />G. follow recommended standards and guidance documents for registered products and check <br />the quality of materials used; <br />H. negotiate with the system owner and jointly determine who will be responsible for seeding, <br />erosion and frost protection, watering, and other vegetation establishment activities; and <br />I. pay the septic system tank fee and submit the form according to Minnesota Statutes, section <br />115.551, including notification if no tanks were installed during the reporting year. The form and payment <br />are due to the commissioner by January 31 for the previous calendar year's installations. <br />Subp. 3. Certified installers. Certified installers must be at the worksite to meet supervision needs <br />as determined by the training and experience level of the crew and local requirements and to ensure that <br />the installation, alteration, or extension of an SSTS is in accordance with an approved design report and <br />permit. The certified installer must prepare quality control and quality assurance records and prepare and <br />sign as -built drawings. The certified installer must personally determine, supervise, and verify: <br />A. the system layout and placement; <br />B. that site conditions allow for construction; <br />C. the proper soil moisture conditions for excavation; <br />Copyright ©2014 by the Rev <br />so <br />of Statutes, State of Minnesota. All Rights Reserved. <br />