Laserfiche WebLink
May 14, 2014 Location: Pbrama >H:Drive >15153 >FindingsReport <br />Considering the proposed building design (and site layout) <br />principles, please rate your level of support. <br />STRONGLY OPPOSE (DOESN'T MITIGATE... <br />OPPOSE <br />NEITHER (NO OPINION) <br />SUPPORT <br />STRONGLY SUPPORT (MITIGATES CONCERNS) <br />0 0.5 1 1.5 2 2.5 3 3.5 <br />4 4.5 <br />Considering building design /site layout concerns ONLY, if the <br />Subject Property were developed for a data center user, I believe <br />the City (and other germane regulatory agencies) have the ability <br />to sufficiently address and mitigate concerns. <br />STRONGLY DISAGREE <br />DISAGREE <br />NEITHER AGREE /DISAGREE (NO OPINION) <br />AGREE <br />STRONGLY AGREE <br />1 2 3 4 5 6 <br />Considering information and mitigation techniques discussed as <br />part of the OMC Study Group Process, building design /site layout <br />concerns for surrounding (or nearby) property owners should <br />PREVENT the City from considering a data center development. <br />STRONGLY DISAGREE <br />DISAGREE <br />N EITHER AGREE /DISAGREE (NO OPINION) <br />AGREE <br />STRONGLY AGREE <br />0 0.5 1 1.5 2 2.5 3 3.5 <br />OMC Study Group, Findings Report (DRAFT) Page 22 of 42 <br />