The 2009 estimated costs for reconstructing Andrie Street and 164th Lane as a 32 foot wide street with concrete <br />curb and gutter, storm sewer, and a 5 foot wide concrete sidewalk was $1,813,000 including indirect costs. If the 5 <br />foot concrete sidewalk is removed and the street is widened by 4 feet to accommodate two 11 foot drive lanes and a <br />6 foot wide on -road bicycle lane, the estimated cost, including indirect costs, becomes $1,647,000. Based on these <br />2009 estimated costs, it is estimated to cost about $166,000 less to construct the on -road bike lane than the off -road <br />sidewalk. <br />Staff is currently updating the 2009 engineer's estimate to reflect 2014 estimated costs for reconstructing Andrie <br />Street and 164th Lane. Cost estimates are being prepared for both a 32 foot wide street section with 5 foot sidewalk <br />and boulevard as originally proposed, and for a 36 foot wide street section incorporating a 6 foot wide on -road <br />bicycle lane and two 11 foot drive lanes. Staff plans to present the 2014 estimated project costs at the next regular <br />Public Works Committee meeting on June 17th. <br />Staff will also be seeking direction on a funding program for this project at the June 17th meeting based on the <br />latest estimated costs and following further discussion regarding the use of special assessments for street <br />reconstruction projects. <br />Funding Source: <br />At this time there are not sufficient funds in the MSA account to fund these improvements as originally proposed. <br />As such, funding would need to be provided using other available sources such as the general levy, special <br />assessments, or bonds. <br />Applying special assessments on this project may prove to be cumbersome since these are larger lots and as was <br />discussed with the City Council on May 13th when assessments are considered with larger lots it provides fewer <br />lots to spread project costs over. <br />Recommendation: <br />Staff recommends providing any additional direction to allow 2014 estimated costs to be completed for discussion <br />at the June 17th Public Works Committee meeting. <br />Action: <br />No action is required at this time, but direction by consensus on any project elements that may impact estimated <br />costs are encouraged. <br />Andrie St Feas Rpt w Surveys <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Grant Riemer Grant Riemer 05/15/2014 12:06 PM <br />Kurt Ulrich Kurt Ulrich 05/15/2014 01:31 PM <br />Form Started By: Bruce Westby Started On: 04/29/2014 12:53 PM <br />Final Approval Date: 05/15/2014 <br />