My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 04/15/2014
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2014
>
Agenda - Public Works Committee - 04/15/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:38:46 AM
Creation date
5/28/2014 11:53:18 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
04/15/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
retaining wall along the outside edge of the trail/sidewalk, but this would increase project costs significantly. Since <br />an alternate route exists at this time, staff recommends waiting to construct a trail connection north of Alpine Drive <br />until such time that the three residential properties are redeveloped, which will most likely occur when the large <br />parcel to the north redevelops. At that time, a 10 foot wide, 2-way, multi -use bituminous trail can be constructed as <br />part of the redevelopment project without incurring extraneous costs to reduce impacts to the existing properties. <br />Until such time, pedestrians and bicyclists can continue to use the bituminous trail on the south side of Alpine Drive <br />by crossing Alpine Drive at the existing mid -block crossing east of Krypton Street. <br />Attached is a layout showing the existing trail system in the area surrounding the intersection of Nowthen <br />Boulevard and Alpine Drive, as well as the location of the proposed trail connection. <br />Funding Source: <br />No funding is required to support this case. <br />Recommendation: <br />Staff recommends waiting to construct the trail connection north of Alpine Drive between Nowthen Boulevard <br />(CSAH 5) and Krypton Street until the properties to the north redevelop. In this event, staff plans to explore costs to <br />relocate the Alpine Drive mid -block pedestrian crossing to the intersection of Krypton Street and enhance the <br />crosswalk to make it more visible to drivers and more accessible to pedestrians. <br />Action: <br />No action is required at this time. <br />CC minutes 012814 <br />Area Trail System <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Kurt Ulrich Kurt Ulrich 04/10/2014 11:41 AM <br />Grant Riemer Grant Riemer 04/10/2014 12:57 PM <br />Kurt Ulrich MaryJo Warner 04/10/2014 01:54 PM <br />Form Started By: Bruce Westby Started On: 04/09/2014 07:47 AM <br />Final Approval Date: 04/10/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.