My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 04/03/2014
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2014
>
Agenda - Planning Commission - 04/03/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:20:52 AM
Creation date
5/28/2014 12:28:43 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
04/03/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
697
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Regular Planning Commission <br />Meeting Date: 04/03/2014 <br />Submitted For: Tim Gladhill, Community Development <br />By: Tina Goodroad, Community Development <br />5. 3. <br />Information <br />Title: <br />Review Sketch Plan for Parcel Owned by Village Bank located at 6080 Highway 10 NW; <br />Case of Village Bank <br />Purpose/Background: <br />The purpose of this case is to review a submitted Sketch Plan for a seven (7) lot single family subdivision that is <br />immediately adjacent to Rivlyn Avenue that will extend an existing cul-de-sac. The site is located on the <br />easternmost border of the City, adjacent to the City of Anoka. The purpose of the Sketch Plan is to review the <br />general layout of the proposed lots, street/cul-de-sac and overall use of the property. This is the first step prior to <br />submittal of a preliminary plat and affords the Commission the opportunity to provide input on the design prior to <br />detailed plans are developed. <br />The Technical Review Memo provides a brief overview of the Sketch Plan with revisions and additional materials <br />that will be required with the preliminary plat. <br />In addition to the subdivision (plat) application, the request will also require a Comprehensive Plan Amendment, <br />Zoning Amendment, and Easement Vacation. The site is currently guided as Business Park and is located within <br />the E-1 Employment District. A portion of the site is located within the Mississippi River Corridor Critical Area <br />(MRCCA). <br />Notification: <br />Staff attempted to notify all Property Owners within 700 feet of the Subject Property via Standard US Mail. A <br />Public Hearing and Notification is required as part of Preliminary Plat (next stage). <br />Observations/Alternatives: <br />The Applicant is requesting to develop a currently undeveloped portion of the Subject Property as seven (7) single <br />family lots, with the extension of Rivlyn Drive. Generally speaking, the request complies with the minimum <br />standards of the R-1 Residential (MUSA) District. There are, however, some potential deficiencies in the request: 1) <br />minimum lot width, 2) side yard setbacks, and 3) length of cul-de-sac. The Applicant is proposing to utilize Planned <br />Unit Development (PUD) provisions of City Code to address these deficiencies. The Applicant will be required to <br />better define the public benefit required of a PUD as part of Preliminary Plat Review. <br />The site is currently impacted by the Highway 10 Access Planning Study currently initiated by the Minnesota <br />Department of Transportation (Mn/DOT). Initial alternatives for frontage road systems would have been in conflict <br />with the proposed plat. However, Mn/DOT, and its consulting engineer Bolton and Menk, Inc., are currently <br />working on alternatives that address comments by this Property Owner, but surrounding Property Owners as well. <br />This planning study will not be complete until later this summer. It is anticipated that the Access Planning Study <br />can work around the current sketch plan concept. <br />Additionally, the site is further impacted by the Mississippi River Trail construction, currently underway and <br />commencing construction on this site later this spring. The current sketch plan was revised to accommodate the <br />approved alignment of this trail. The trail was awarded a federal grant, and the construction contract has been <br />awarded and construction is already underway. It is not feasible to expect that the trail alignment and construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.