Laserfiche WebLink
the southwest quadrant of the City. Table ES.6 provides budgetary costs for construction of <br />these improvements. <br />TABLE ES.6 <br />PROPOSED WATER STORAGE IMPROVEMENTS <br />Project <br />Estimated <br />Target <br />1. RTC Plat Phase <br />Capital CostsWWW <br />Completion Date <br />1. Construction 1.5 MG Elevated Storage Tower <br />$2,000,000 <br />2006 <br />2. Construct 1.5 MG Ground Storage Reservoir <br />$2,000,000 <br />2007 <br />(1) Estimated capital costs include construction, contingencies, engineering, administrative <br />and legal costs. <br />2. Distribution System Improvements <br />Figure ES -2 shows the primary water distribution system improvements proposed for the <br />City of Ramsey, as well as the proposed water storage facility locations. <br />Table ES.7 provides a summary of the proposed water distribution system improvements. <br />TABLE ES.7 <br />DISTRIBUTION SYSTEM IMPROVEMENTS <br />2004-2014 <br />Project <br />Estimated <br />Capital Cost <br />Target <br />Completion Date <br />1. RTC Plat Phase <br />$757,000 <br />2004 <br />2. Alpine Park to Regency Pond <br />$185,000 <br />2004 <br />3. RTC Phase I <br />$235,000 <br />2005 <br />4. NE & NW Extension <br />$4,950,000 <br />2005 <br />5. RTC Phase II <br />$155,000 <br />2006 <br />6. Water Tower Connection <br />$275,000 <br />2006 <br />7. Alpine Drive — CSAH 5 to Geranium St. WM <br />$124,000 <br />2007 <br />8. Sunwood from 57 to 116 <br />$130,000 <br />_ 2007 <br />9. Parabody to Waltek <br />$120,000 <br />2008 <br />10. Sunfish Lake Estates to Fox Knoll <br />$170,000 <br />2009 <br />11. 153rd to Apple Ridge <br />$295,000 <br />2010 <br />12. 151St to Apple Ridge <br />$310,000 <br />2010 <br />13. Industry Ave. to TH 47 <br />$2,500,000 <br />2010 <br />City of Ramsey, Minnesota — M21.34343 <br />Water System Study <br />Page ES -7 <br />Prepared by Bolton & Menk, Inc. <br />