Laserfiche WebLink
4. Groundwater treatment plant construction cost includes a 12 mgd peak capacity <br />facility. Facility includes aeration, detention, granular media filtration, chemical <br />treatment and high service pumping facilities. <br />5. Surface Water Treatment Plant construction costs includes a 12 mgd peak <br />capacity facility. Facility includes disinfection ultra -filtration membrane filters, <br />chemical treatment and high service pumping facilities. Cost also includes water <br />intake facilities and raw water transmission main. <br />6. Well No. 9 — 15 construction includes well, well pump, electrical and controls for <br />each well. For Alternative No. 1, cost includes raw water transmission mains to <br />water treatment facility. <br />City of Ramsey, Minnesota — M21.34343 Page 5-5 <br />Water System Study Prepared by Bolton & Menk, Inc. <br />