Laserfiche WebLink
Figure 6.1 shows the primary water distribution system improvements proposed for the <br />City of Ramsey, as well as the proposed water storage facility locations. <br />Table 6.2 provides a summary of the proposed water distribution system improvements. <br />These improvements generally can be categorized as follows: <br />1. Improvements required as part of the Ramsey Town Center (RTC) development <br />project. <br />2. General system improvements to existing service areas. <br />3. Improvements required to support development outside of the existing service <br />areas. <br />TABLE 6.2 <br />DISTRIBUTION SYSTEM IMPROVEMENTS <br />2004-2014 <br />Project <br />Estimated <br />Capital Cost <br />Target <br />Completion Date <br />1. RTC Plat Phase <br />$757,000 <br />2004 <br />2. Alpine Park to Regency Pond <br />$185,000 <br />2004 <br />3. RTC Phase I <br />$235,000 <br />2005 <br />4. NE & NW Extension _ <br />$4,950,000 <br />2005 <br />5. RTC Phase II <br />$155,000 <br />2006 <br />6. Water Tower Connection <br />$275,000 <br />2006 <br />7. Alpine Drive — CSAH 5 to Geranium St. WM <br />$124,000 <br />2007 <br />8. Sunwood from 57 to 116 <br />$130,000 <br />2007 <br />9. Parabody to Waltek <br />$120,000 <br />2008 <br />10. Sunfish Lake Estates to Fox Knoll <br />$170,000 <br />2009 <br />11. 153`a to Apple Ridge <br />$295,000 <br />2010 <br />12. 151St to Apple Ridge <br />$310,000 <br />2010 <br />13. Industry Ave. to TH 47 <br />$2,500,000 <br />2010 <br />In addition to these improvements, on-going maintenance and replacement projects are <br />required throughout the system. The budget analysis provided in Appendix F identifies <br />budgetary items related to maintenance and replacement projects. <br />City of Ramsey, Minnesota — M21.34343 Page 6-3 <br />Water System Study Prepared by Bolton & Menk, Inc. <br />