My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 04/10/2014
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2014
>
Agenda - Parks and Recreation Commission - 04/10/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 1:00:40 PM
Creation date
5/28/2014 1:55:11 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
04/10/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
574
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 6.1 shows the primary water distribution system improvements proposed for the <br />City of Ramsey, as well as the proposed water storage facility locations. <br />Table 6.2 provides a summary of the proposed water distribution system improvements. <br />These improvements generally can be categorized as follows: <br />1. Improvements required as part of the Ramsey Town Center (RTC) development <br />project. <br />2. General system improvements to existing service areas. <br />3. Improvements required to support development outside of the existing service <br />areas. <br />TABLE 6.2 <br />DISTRIBUTION SYSTEM IMPROVEMENTS <br />2004-2014 <br />Project <br />Estimated <br />Capital Cost <br />Target <br />Completion Date <br />1. RTC Plat Phase <br />$757,000 <br />2004 <br />2. Alpine Park to Regency Pond <br />$185,000 <br />2004 <br />3. RTC Phase I <br />$235,000 <br />2005 <br />4. NE & NW Extension _ <br />$4,950,000 <br />2005 <br />5. RTC Phase II <br />$155,000 <br />2006 <br />6. Water Tower Connection <br />$275,000 <br />2006 <br />7. Alpine Drive — CSAH 5 to Geranium St. WM <br />$124,000 <br />2007 <br />8. Sunwood from 57 to 116 <br />$130,000 <br />2007 <br />9. Parabody to Waltek <br />$120,000 <br />2008 <br />10. Sunfish Lake Estates to Fox Knoll <br />$170,000 <br />2009 <br />11. 153`a to Apple Ridge <br />$295,000 <br />2010 <br />12. 151St to Apple Ridge <br />$310,000 <br />2010 <br />13. Industry Ave. to TH 47 <br />$2,500,000 <br />2010 <br />In addition to these improvements, on-going maintenance and replacement projects are <br />required throughout the system. The budget analysis provided in Appendix F identifies <br />budgetary items related to maintenance and replacement projects. <br />City of Ramsey, Minnesota — M21.34343 Page 6-3 <br />Water System Study Prepared by Bolton & Menk, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.