My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 06/17/2014
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2014
>
Agenda - Public Works Committee - 06/17/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:39:18 AM
Creation date
6/23/2014 12:24:33 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
06/17/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION <br />At the May 20, 2008 Public Works Committee meeting the Committee was presented <br />with a petition signed by 54 persons representing 36 of the 67 properties benefitted by <br />this proposed project, A copy of this petition is included in Appendix A. Andrie Street <br />and 164th Lane had been proposed for a bituminous overlay in 2008 as a part of the <br />annual street maintenance program. The petition requested that Andrie and 164th Lane <br />receive additional improvements primarily concrete curb and gutter and other elements <br />which would bring the street in compliance with Municipal State Aid (MSA) standards, <br />City Council directed the preparation of this feasibility study on June 10, 2008 in <br />response to this petition. <br />The project area and benefitted properties is, illustrated in Figure 1. This report will <br />identify the existing street condition along with the proposed improvements and the <br />associated costs and financing, including the cost to each benefitted property, The reader <br />is referred to the proposed improvement and financing sections of this report for the <br />details concerning these project elements. Finally this report will provide a project <br />timeline. <br />EXISTING CONDITIONS <br />Both Andrie Street and 164th Lane were constructed in 1985 as a 31 feet wide roadway <br />with a four inch class 5 base and a two inch bituminous wear course which was standard <br />construction requirements at that time. The roadway has a bituminous berm curb and is <br />serviced with storm sewer and a number of catchbasins which discharge to adjacent low <br />areas. These areas are encumbered with drainage and utility easements to allow. for this <br />purpose. The road has received periodic maintenance including cracksealing and <br />sealcoating operations which were performed most recently in 1999, The road surface is <br />exhibiting deficiencies consistent with its age which include alligator cracking in low <br />lying and flat areas, and particularly severe raveling along the bituminous curb line. This <br />raveling has probably been aggravated by the intensive use of irrigation systems along <br />the roadway. At several locations the drainage must travel overland for a distance in <br />excess of 700 feet to reach a storm sewer. Many of the catch basin structures are <br />constructed of concrete block which have failed or are deteriorating, <br />PROPOSED IMPROVEMENTS <br />The existing two inch mat of bituminous along with the bituminous curb and gutter shall <br />be removed and shall be reclaimed as base material at a minimum thickness of four <br />inches: A 32 foot wide bituminous pavement is to be constructed in the center of the 66 <br />foot right of way. The pavement section will consist of a four to six inch class <br />5/reclaimed bituminous base, two inches of bituminous base course, and 1,5 inches <br />bituminous wear course which constitutes a 10 ton street design in Ramsey's sandy <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.