Laserfiche WebLink
1e4o1 1 <br />00'009 $ <br />$ 7,600.00I <br />$ <br />43,200.00 <br />I 0 0' 00 ti` £ t , $ <br />00'090`6£ $ <br />00'090`6 $ <br />$ 142,900.00 <br />$ 14,290.00 <br />I00'061 $ <br />00'06£ $ <br />00'042 $ <br />00 00Z $ <br />I $ 1,000.00 <br />$ 3,900.00 <br />$ 2,400.00 <br />$ 21,000.00 <br />00008'66 $ <br />00 6 $ <br />$ 24,000.00 <br />$ 8,100.00 <br />$ 7,600.00 <br />$ 2,500.00 <br />$ 23,200.00 <br />$ 1,600.00 <br />$ 14,250.00 <br />$ 4,750.00 <br />$ 2,400.00( <br />00'006'6 $ dS 008'£ <br />1 silufl <br />AS <br />dS <br />dl <br />AS <br />Al <br />dl <br />VA <br />dS <br />dl <br />dS <br />dS <br />dS <br />V3 <br />VA <br />dS <br />dS <br />dS <br />VA <br />1 Quantity 1 <br />6£ <br />09 <br />96 <br />Ob <br />926 ' <br />4 I <br />006 <br />09£ <br />009'7 <br />009' I. <br />009 <br />Z <br />008 <br />008 <br />008'2 <br />Lo <br />Description <br />Demolition <br />Sawcut, Demo and dispose Bituminous Pavement <br />Demo and Dispose Concrete Sidewalk <br />Sitework / Earthwork / Utilities <br />Wet tap WM and install 4" waterline to lower level of stair elevator <br />Add Sanitary Sewer Drain and connect to existing San Sewer <br />Patch Bituminous and Concrete Grade Slab, Add Concrete Apron <br />Concrete Foundations and Concrete and Masonry Walls <br />24" Concrete Caisson and door threshold frost footing <br />Precast Concrete Spandrels <br />CMU Infill and Pilasters <br />Thermal and Moisture Protection, Doors and Finishes <br />Backer Rod and Sealants <br />1 1/2" Rigid Insulation and Fiber Board and Paint Wall Interiors <br />1 -1/2" Spray Insulation on ceiling <br />_ 1 <br />Man Door and Insulated 8' x16' Overhead Door wl access controls <br />Arch Coating <br />Mechanical <br />Dry Sprinkler, controls and enunciator panel; <br />Reroute Sanitary Risers <br />Mechanical Ventilation and CO detection <br />aaleaH llufl oploal3 MN 0 <br />teoppal3 <br />(Add Light Fixtures and Exit sign <br />uleaci aoold of 00eal mail 0140013 pun stallnO PPv <br />Subtotal <br />Contingency @ 10% <br />(Probable Cost of Construction <br />N <br />M <br />d <br />N <br />DD Level Estimate of Construction Cost for 2014 Construction <br />LSA Design Inc. <br />