Laserfiche WebLink
CC Work Session 2. 3. <br />Meeting Date: 06/24/2014 <br />Title: <br />Parking Ramp Garage <br />Information <br />Purpose /Background: <br />Staff discussed with council at the February 25, 2014 Work Session the possibility of creating a garage area inside <br />the existing parking ramp structure for City property. The February 25 case is attached to this case for review. Staff <br />was authorized to have LSA make plans and provide an estimate for a garage. LSA was also instructed to review <br />the current lighting system. LSA estimates and worksheets are attached to this case. The following list is the <br />vehicles and equipment that would be kept in the parking in ramp garage. <br />Police Radar Trailer <br />Police Range Trailer <br />Safety Camp Trailer <br />2- ATV's <br />ATV Trailer <br />Seized Vehicles- currently two that need inside storage <br />6- City Admin Vehicles <br />2- Engineering Trucks <br />Building Maintenance Vehicle (Dan's) <br />2- Walk behind Snow Blowers <br />Sidewalk Blower Vehicle <br />Various Happy Days Supplies (much of which needs to be stored indoors) <br />If the Council decides to move forward with this project, Staff would recommend "Design II" included in your <br />attachments. This design shows a larger, full build -out garage space, in comparison to "Design I" which is slightly <br />smaller. Staff recommends "Design II" for a couple major reasons: (1) the entire space /capacity shown in "Design <br />II" is needed today; and (2) breaking this project into two separate work orders will result in increased costs to the <br />City. Design II has an estimated cost of $193,930. <br />Timeframe: <br />30 minutes <br />Funding Source: <br />Public Facility Construction Fund. The Public Facility Construction Fund is used to fund the acquisition of land and <br />construction for public facilities. Examples of the use of this fund has been to pay for the design of the new <br />municipal center /police station and the remodel at the old city hall. <br />The fund has an estimated ending 2014 balance of $435,093 (prior to Parking Ramp Garage). The majority of the <br />fund balance is attributed to the transfer from the 2013 General Fund per the excess revenue fund policy in the <br />amount of $286,600. <br />Responsible Party(ies): <br />Dan Bray, Grant Riemer, Dean Kapler, Diana Lund and Jim Way <br />Outcome: <br />