Laserfiche WebLink
Staff included $25,000 in the 2014 - 2018 CIP to be funded from the Facility Fund. The Police Department has <br />approximately $15,000 in a special account from "lot fees" for seized or forfeited vehicles. The initial design fees of <br />$4500 are proposed to come from the Facility Fund, however, additional funding will need to be determined. Staff <br />is proposing that this funding be proposed as part of the 2015 budget, once better costs have been establish through <br />this initial design review. <br />Responsible Party(ies): <br />City Administrator Ulrich will oversee the project with Dan Bray and Jim Way working with LSA on design . <br />Outcome: <br />To move forward with the proposed plan for storage space in the parking ramp by authorizing LSA Design, Inc. to <br />prepare Building Code analysis, schematic plans and a cost estimate, plus a cost/benefit analysis of a lighting <br />retrofit, per the attached proposal, for a lump sum fee of $4500. <br />Ramp <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Kurt Ulrich Jim Way 02/10/2014 01:14 PM <br />Jim Way (Originator) Jim Way 02/10/2014 01:16 PM <br />Kurt Ulrich Kurt Ulrich 02/20/2014 02:05 PM <br />Form Started By: Jim Way Started On: 02/05/2014 10:02 AM <br />Final Approval Date: 02/20/2014 <br />