Laserfiche WebLink
a. Trunk and lateral sanitary sewer (not required) <br />b. Trunk and lateral water main (not required) <br />c. Storm drainage facilities <br />d. Stormwater maintenance through ninety percent (90%) buildout <br />e. Streets <br />f Concrete curb and gutter (not required) <br />g. Street traffic control signals (not required) <br />h. Lot grading <br />i. Trail development <br />j. Sidewalks (not required) <br />k. Electricity (within one-fourth mile) <br />1. Phone (within one-fourth mile) <br />m. Natural gas (within one-fourth mile) <br />n. Boulevard sodding <br />o. Water shut off boxes (not applicable) <br />p. Easement acquisition <br />q. As -built plans <br />r. Stage I financial surety <br />(the "Stage I Improvements"). <br />The PERMITTEE agrees to construct the Stage I Improvements according to the <br />terms and conditions of this Agreement and in accordance with the Plans and the <br />City Code. Per City Code Section 117-615, the PERMITTEE shall provide the <br />CITY with a set of re -producible as -built plans in Computer Aided Drafting (CAD) <br />format upon completion of the Stage I Improvements and acceptance by the CITY. <br />As as -built plans are a required Stage I Improvement item per City Code Section <br />117-615, the CITY will not release the required Stage I Improvement Financial <br />Guarantee noted in paragraph #6 below. Additionally, the PERMITTEE agrees to <br />provide to the CITY the plans in CAD format prior to the commencement of <br />construction of the Stage I Improvements. <br />4. Additional Requirements Related to Certain Stage I Improvements. This <br />paragraph intentionally deleted. <br />5. Lot Corner Staking. The PERMITTEE must install lot corner stakes at all lot <br />corners. <br />6. Stage I Improvement Financial Guarantee. The PERMITTEE shall provide a <br />financial guarantee to the CITY guaranteeing the construction of the Stage I <br />Improvements and their timely completion. The PERMITTEE shall be <br />responsible for a financial guarantee in the amount of Dollars and No <br />Cents ($ .00), which amount is 125% of the CITY Engineer's estimated cost <br />of the Stage I Improvements. Upon completion of Stage I Improvements (including <br />the removal of "temporary" erosion control measures as identified in the approved <br />Grading Plan), acceptance by the CITY, supported by appropriate lien waivers, <br />