My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 07/10/2014
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2014
>
Agenda - Planning Commission - 07/10/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:21:11 AM
Creation date
7/9/2014 12:24:53 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
07/10/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />Fees Payable to the City <br />1. Park Dedication. The PERMITTEE is responsible for satisfying applicable Park <br />Dedication requirements. The 2014 Park Dedication Fee applicable to the Plat is <br />$2,600 per residential unit. PERMITTEE must pay a Park Dedication Fee of <br />Seven Thousand Eight Hundred Dollars and No Cents ($2,600 x 3 units = <br />$7,800.00). The PERMITTEE acknowledges that these fees are estimates. The <br />rate in effect when the Plat is recorded will be collected. <br />2. Trail Development Fees. The PERMITTEE is responsible for satisfying <br />applicable Trail Development Fee requirements. The 2014 Trail Development Fee <br />applicable to the Plat is $700 per residential unit. PERMITTEE must pay a Trail <br />Development Fee of Two Thousand One Hundred Dollars and No Cents ($700 x 3 <br />units = $2,100.00). The PERMITTEE acknowledges that these fees are estimates. <br />The rate in effect when the Plat is recorded will be collected. <br />3. Sanitary Sewer Connection (Trunk) Fees. The PERMITTEE ::. responsible <br />for satisfying applicable Sanitary Sewer Trunk Fee requirements. <br />4. Water Connection (Trunk) Fees. The PERMITTEE is not responsible for <br />satisfying applicable Water Trunk Fee requirements. <br />5. Sanitary Sewer Lateral Benefit Fees. The PERMITTEE is not responsible for <br />satisfying Sanitary Sewer Lateral Benefit Fees. <br />6. Water Lateral Benefit Fees. The PERMITTEE is not responsible for satisfying <br />Water Lateral Benefit Fees. <br />7 Stormwater Management Fee. The PERMITTEE is responsible for satisfying <br />applicable Stormwater Trunk Fee requirements. The 2014 Stormwater <br />Management Fee $459 per residential unit. PERMITTEE must pay a Stormwater <br />Management Fee of One Thousand Three Hundred Seventy Seven Dollars and No <br />Cents ($459 x 3 units = $1,377.00). The PERMITTEE acknowledges that these <br />fees are estimates. The rate in effect when the Plat is recorded will be collected. <br />8. Street Light Fee. The PERMITTEE is not responsible for satisfying Street Light <br />Fees. <br />9. Street Light Operation and Maintenance Fee. The PERMITTEE is not responsible <br />for satisfying Street Light Operation and Maintenance Fees. <br />
The URL can be used to link to this page
Your browser does not support the video tag.