My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 07/10/2014
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2014
>
Agenda - Planning Commission - 07/10/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:21:11 AM
Creation date
7/9/2014 12:24:53 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
07/10/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: Preliminary Plat Review (July 3, 2014) <br />Ridgepointe <br />Page 8 of 10 <br />In reviewing the Highway 10 Access Planning Study Local Road Alternatives and Land Use Scenarios, the Planning <br />Commission could recommend that the City Council eliminate one of the Local Road Alternatives from further <br />consideration. <br />Avvroval of the vrovosed vlat would on its own eliminate Tungsten Street Area Local Road Alternative #2 from further <br />consideration. <br />Development Fees: Park Dedication, Trail Development, Sanitary Sewer Trunk, Water Trunk, and Stormwater <br />Management Fees shall be due on the Plat. These fees are collected at the time and at the rate the Final Plat is recorded. <br />Sanitary Sewer and Water Lateral Benefit Fees are not required, as these services are proposed to be built as part of the <br />development (not connecting individual services to existing water and sewer system). The Park and Recreation <br />Commission shall review and make a recommendation regarding Park Dedication and Trail Development Fees. At this <br />time, Staff recommends that a cash contribution be used to satisfy Park Dedication and Trail Development requirements. <br />Mississippi River Trail. The City of Ramsey, in coordination with the City of Anoka, has approved the Mississippi River <br />Trail project that impacts this site. The trail alignment is indicated on the Preliminary Plat. Construction of the project has <br />already commenced, and work will begin on the Subject Property in 2014. The trail was made possible by a Federal grant. <br />As the grant has been awarded, as well as the contract for construction, it is not feasible to make changes to this <br />improvement project at this time. <br />PROPOSED <br />10' ON.ROAD <br />BIKEWAY <br />LEGEND <br />PROPOSED TRAIL <br />EXISTING TRAIL <br />PROPOSED STRIPED SHOULDER <br />FLOOD PLAIN LIMITS <br />WETLAND LIMITS <br />CONSTRUCTION LIMITS <br />11 BLUFF AREA <br />VEGETATIVE SUFFER <br />WETLANDS <br />PROPOSED <br />SHARED LANE <br />MCSStSSIPPI <br />RIVER <br />PROPOSED TRAIL <br />110' BITUMINOUS) <br />WETLAND <br />FLOOD PLAIN LIMITS <br />CONNECT TO EXISTING TRAIL SYSTEM <br />CONSTRUCTION LIMITS <br />BRIDGE <br />I13oa_TON a MCNIc. Rao. <br />mre- uipra a s..... <br />O GG! <br />RIVER' <br />COMMUNI <br />PARK <br />CITY OF ANOKA. MINNGSOTA <br />MINDS GLAND TRAA PROJECT <br />EAST 5.314.11- <br />The trail is proposed to be constructed in an existing permanent road easement. This road easement is no longer needed <br />for motor vehicle access to King's Island (Anoka), but can be utilized for construction of the Mississippi River Trail. The <br />existing easement is larger than necessary for trail purposes, and portions can be vacated. <br />Staff had attempted to work diligently with the previous Property Owner, as well as the current Property Owner (Village <br />Bank) in the past to identify an alternative alignment of the trail that maximized the development potential of the site, <br />while still maintaining design criteria for the Mississippi River Trail. The City and Property Owner were unable to arrive <br />
The URL can be used to link to this page
Your browser does not support the video tag.