Laserfiche WebLink
L <br />= <br />0 <br />e _ <br />(D <br />-o <br />= <br />CU <br />0 <br />0 <br />a) <br />co <br />e _ <br />e _ <br />= <br />$2,200,000 $100,000 <br />inUWOWM <br />struct North Frontage Rd <br />MA / LOCAL / MSAS / PRIV <br />property owner meeting I C <br />$16M for W B Flyover I $2 <br />9.2 for EB and WB Flyover <br />$11 for WB Flyover up t <br />th Local Overpass with RI/RO <br />$11.4 for WB Flyave <br />EB Flyover or High-T with Loc <br />/ \ / !!1 \ §;1!IIH 24 § \ <br />\� k§ 2 } } [j{{ } <br />` i/i&§ g <br />2 : D20E Fr <br />) <br />\ <br />; I <br />51,400,0D0 <br />00 <br />MA / LOCAL / PRIV <br />-2 Sou01 Frontage Rd Extension <br />HSIP / MA/ LOCAL / TH / MSAS <br />HSIP / MA/ LOCAL / TH / MSAS <br />MA/ LOCAL / PRIV / TED <br />third <br />