Laserfiche WebLink
Public Works Committee <br />Meeting Date: 07/15/2014 <br />Submitted For: Grant Riemer, Engineering/Public Works <br />By: Grant Riemer, Engineering/Public Works <br />Title: <br />Update on Crosswalk Relocation at Alpine Dr/Helium St <br />6. 2. <br />Purpose/Background: <br />At the April 15th PW Committee meeting staff was given direction to move the existing crosswalk located near the <br />intersection of Alpine Dr/Krypton St to a new location 500 ft to the east at the intersection of Alpine Dr/ Helium St. <br />This location was chosen for several reasons, it seems to be the preferred route for students from the north side of <br />Alpine Dr to cross on their way to Ramsey Elementary, there is street light at that location and the sight lines for <br />both motorists and pedestrians are improved over the original location. Work will begin the last week of July. The <br />reason for the delay in making the move is the ability to get a better price from our concrete contractor. If we can <br />combine several small projects like this, he can get a better price on concrete, instead of ordering 1-2 yards at a <br />time. Concrete company's charge up to $500.00 extra for what they consider a short load. This adds considerably to <br />the cost of a small project. <br />Timeframe: <br />5 minutes <br />Observations/Alternatives: <br />N/A <br />Funding Source: <br />Trail dedication fund <br />Recommendation: <br />Action: <br />None required, update only. <br />No file(s) attached. <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Kurt Ulrich Kurt Ulrich 07/09/2014 03:09 PM <br />Form Started By: Grant Riemer Started On: 07/09/2014 01:56 PM <br />Final Approval Date: 07/09/2014 <br />