My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/11/2014
Ramsey
>
Public
>
Agendas
>
Council
>
2014
>
Agenda - Council - 08/11/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:22:29 PM
Creation date
8/13/2014 10:44:24 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/11/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
872
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF ARTICLES <br />1 INITIAL INFORMATION <br />2 ARCHITECT'S RESPONSIBILITIES <br />3 SCOPE OF ARCHITECT'S BASIC SERVICES <br />4 ADDITIONAL SERVICES <br />5 OWNER'S RESPONSIBILITIES <br />6 COST OF THE WORK <br />7 COPYRIGHTS AND LICENSES <br />8 CLAIMS AND DISPUTES <br />9 TERMINATION OR SUSPENSION <br />10 MISCELLANEOUS PROVISIONS <br />11 COMPENSATION <br />12 SPECIAL TERMS AND CONDITIONS <br />13 SCOPE OF THE AGREEMENT <br />EXHIBIT A INITIAL INFORMATION <br />ARTICLE 1 INITIAL INFORMATION <br />§ 1.1 This Agreement is based on the Initial Information set forth in this Article 1 and in optional Elhibit A, Initial <br />Information: <br />(Complete Exhibit A, Initial Information, and incorporate it into the Agreement at Section 13.2, or state below <br />Initial Information such as details of the Project's site and program, Owner's contractors and consultants, <br />Architect's consultants, Owner's budget for the Cost of the Work, authorized representatives, anticipated <br />procurement method, and other information relevant to the Project) <br />1 <br />1 <br />§ 1.2 The Owner's anticipated dates for commencement of construction and Substantial Coi►let on of the Work are <br />set forth below: <br />.1 Commencement of construction date: <br />Spring 2015 <br />.2 Substantial Completion date: <br />January 2016 <br />§ 1.3 The Owner and Architect may rely on the Initial Information. Both parties, however, r-+gnize that such <br />information may materially change and, in that event, the Owner and the Architect shall app- (priately adjust the <br />schedule, the Architect's services and the Architect's compensation. <br />ARTICLE 2 ARCHITECT'S RESPONSIBILITIES <br />§ 2.1 The Architect shall provide the professional services as set forth in this Agreement. <br />AIA Document 5101.' - 2007 (formerly 5151^' - 1997). Copyright © 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. <br />All rights reserved. WARNING: This AIA. Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction <br />x distribution of this AIA® Document, or any portion of it, may result insevere ciand c nal penalties, and will be prosecuted to <br />the max extent possible under the law. This draft was produced by AIA software at 10.02.21 on 12/17/2007 under Order No.1000305200_1 <br />which expires on 6/14/2008, and is not for resale. <br />User Notes: (434271448) <br />
The URL can be used to link to this page
Your browser does not support the video tag.