Laserfiche WebLink
§ 3.1.3 As soon as practicable after the date of this Agreement, the Architect shall submit for the Owner's approval a <br />schedule for the performance of the Architect's services. The schedule initially shall include anticipated dates for the <br />commencement of construction and for Substantial Completion of the Work as set forth in the Initial Information. <br />The schedule shall include allowances for periods of time required for the Owner's review, for the performance of <br />the Owner's consultants, and for approval of submissions by authorities having jurisdiction over the Project. Once <br />approved by the Owner, time limits established by the schedule shall not, except for reasonable cause, be exceeded <br />by the Architect or Owner. With the Owner's approval, the Architect shall adjust the schedule, if necessary as the <br />Project proceeds until the commencement of construction. <br />§ 3.1.4 The Architect shall not be responsible for an Owner's directive or substitution made without the Architect's <br />approval. <br />§ 3.1.5 The Architect shall, at appropriate times, contact the governmental authorities required to approve the <br />Construction Documents and the entities providing utility services to the Project. In designing the Project, the <br />Architect shall respond to applicable design requirements imposed by such governmental authorities and by such <br />entities providing utility services. <br />§ 3.1.6 The Architect shall assist the Owner in connection with the Owner's responsibility for filing documents <br />required for the approval of governmental authorities having jurisdiction over the Project. <br />§ 3.3 DESIGN DEVELOPMENT PHASE SERVICES <br />§ 3.3.1 Based on the Owner's approval of the Schematic Design Documents, and on the Owner's authorization of <br />any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare <br />Design Development Documents for the Owner's approval. The Design Development Documents shall illustrate and <br />describe the development of the approved Schematic Design Documents and shall consist of drawings and other <br />documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building <br />systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and <br />electrical systems, and such other elements as may be appropriate. The Design Development Documents shall also <br />include outline specifications that identify major materials and systems and establish in general their quality levels. <br />§ 3.3.2 The Architect shall update the estimate of the Cost of the Work. <br />§ 3.3.3 The Architect shall submit the Design Development documents to the Owner, advise the Owner of any <br />adjustments to the estimate of the Cost of the Work, and request the Owner's approval. <br />§ 3.4 CONSTRUCTION DOCUMENTS PHASE SERVICES <br />§ 3.4.1 Based on the Owner's approval of the Design Development Documents, and on the Owner's authorization of <br />any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare <br />Construction Documents for the Owner's approval. The Construction Documents shall illustrate and describe the <br />further development of the approved Design Development Documents and shall consist of Drawings and <br />Specifications setting forth in detail the quality levels of materials and systems and other requirements for the <br />construction of the Work. The Owner and Architect acknowledge that in order to construct the Work the Contractor <br />will provide additional information, including Shop Drawings, Product Data, Samples and other similar submittals, <br />which the Architect shall review in accordance with Section 3.6.4. <br />§ 3.4.2 The Architect shall incorporate into the Construction Documents the design requirements of governmental <br />authorities having jurisdiction over the Project. <br />§ 3.4.3 During the development of the Construction Documents, the Architect shall assist the Owner in the <br />development and preparation of (1) bidding and procurement information that describes the time, place and <br />conditions of bidding, including bidding or proposal forms; (2) the form of agreement between the Owner and <br />Contractor; and (3) the Conditions of the Contract for Construction (General, Supplementary and other Conditions). <br />The Architect shall also compile a project manual that includes the Conditions of the Contract for Construction and <br />Specifications and may include bidding requirements and sample forms. <br />§ 3.4.4 The Architect shall update the estimate for the Cost of the Work. <br />AIA Document B101.' - 2007 (formerly 6151'^' - 1997). Copyright ® 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. <br />All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction <br />r distribution of this AIA® Document, or any portion of it, may result incivil and criminal penalties, and will be prosecuted to <br />� <br />the max extent possible under the law. This draft was produced by AIA software at 10:02:213on 12/17/2007 under Order No.1000305200_1 <br />which expires on 6/14/2008, and is not for resale. <br />User Notes: (434271448) <br />