Laserfiche WebLink
Schematic Design Report <br />Ramsey Fire Station #2 <br />5650 Alpine Drive NW, Ramsey MN 55303 <br />Commission No.: 1937.01 <br />BKV <br />GROUP <br />Schematic Design Project Cost Estimate <br />Preliminary Project Cost Estimate: <br />A. Construction Estimate: <br />1. New 10,346 GSF Fire Station with 1,399 GSF mezzanine = $2,500,000 <br />2. General excavation and site work = $375,000 <br />3. Security System = $15,000 <br />4. Data / Telecom wiring = $50,000 <br />5. Design & Construction contingency = $290,000 <br />Construction Estimate = $3,230,000 <br />B. Soft Cost Estimate: <br />1. A/E Fees - $171,000 <br />2. Reimbursable Expenses - $8,000 <br />3. Survey — Estimated at $2,500 <br />4. CM / Project Management Fees (Not currently included) <br />5. FF&E (Furniture, Fixtures and equipment) — Estimated at $200,000 <br />6. SAC / WAC (sewer and water connection fees) - Estimated at $30,000 <br />7. Bond costs (City to determine) <br />8. Plan review fee - Estimated at $15,000 <br />9. Testing (construction) - Estimated at $7,000 <br />10. Bid document printing - Estimated at $6,000 <br />11. Commissioning (this deals with a separate mechanical firm providing review during design and then <br />testing after installation and after a full season of use to verify system performance) — Estimated at <br />$20,000 <br />12. General Project Contingency - $50,000 <br />Soft Cost Estimate = $509,500 <br />Estimated Total Project Cost = $3,739,500 <br />While there are still many design and planning issues to be finalized during the design process we would estimate <br />that the total project cost of approximately $3,700,000 is very appropriate for similarly sized fire stations in the area <br />based on the information and direction of Schematic Design. <br />This estimate assumes construction to start in spring of 2015 with the project bidding sometime around January or <br />February of 2015. If the schedule is delayed past this time frame we would recommend that the estimate be <br />increased by 4.5% each year based on anticipated changes in the construction industry. <br />BKV Group, Inc. <br />