Laserfiche WebLink
lour 1111.1siion: To work together to reiposihty grow our community, and to provide quality, coat -effective, and efficient government ierrlcas. <br />CC Regular Session 7. 4. <br />Meeting Date: 08/11/2014 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title: <br />Consider Adoption of Resolution #14-08-159 Accepting Quotes and Awarding a Contract for Improvement Project <br />#14-29; Alpine Drive Watermain Improvements <br />Purpose/Background: <br />Purpose <br />The purpose of this case is to accept quotes and award a contract for Improvement Project 14-29, Alpine Drive <br />Watermain Improvements. This improvement project will allow the City to most cost-effectively construct a looped <br />watermain connection between the existing trunk watermain stub under Alpine Drive, west of Kryton Street, to the <br />existing trunk watermain under Nowthen Boulevard/CSAH 5 by coordinating the work with improvements to be <br />completed by Anoka County at the intersection of Alpine Drive and Nowthen Boulevard/CSAH 5 in the fall of 2014. <br />Background <br />On January 28, 2014 the City Council approved a Joint Powers Agreement with Anoka County for completing the <br />Alpine Drive and Nowthen Boulevard/CSAH 5 Intersection Improvements. At the time, staff discussed the benefits <br />of constructing a looped watermain connection under Alpine Drive between Krypton Street and Nowthen <br />Boulevard/CSAH 5 in conjunction with the County led project since the intersection of Alpine Drive and CSAH 5 <br />would be under construction, saving the City money by not needing to provide our own traffic control or paving the <br />street when the work was complete. The City Council agreed and authorized staff to proceed with the preparing <br />plans for this work. <br />After preparing plans and specifications to connect the existing trunk watermain terminating west of Kryton Street <br />under Alpine Drive to the exsting trunk watermain under Nowthen Boulevard/CSAH 5, staff submitted requests for <br />quotes to three contractors for completing the proposed watermain improvements. Two quotes were received on <br />July 29, 2014. Below is a tabulation of the quotes. <br />CONTRACTOR QUOTE <br />Dave Perkins Contracting, Inc. $78,175.00 <br />Reshetar Systems I $82,000.00 <br />Engineer's Estimate I $66,000.00 <br />The quotes include costs for installing 735 feet of 8 inch, class 52 ductile iron pipe watermain under 3 separate <br />mobilizations due to the staging plans developed for the County led project. Other materials included a 12 inch x 8 <br />inch wet tap, a hydrant with a 6 inch valve and box, and one 8 inch and one 6 inch gate valve and box. Attached is <br />the plan for this work. <br />The Contractor will be required to maintain minimum insurance coverages, and all work shall be carried out during <br />normal working hours from 7:00 a.m. to 10:00 p.m., Monday through Saturday, in accordance with City ordinances. <br />