My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 08/07/2014
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2014
>
Agenda - Planning Commission - 08/07/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:21:18 AM
Creation date
8/18/2014 9:38:06 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
08/07/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE #14-09 <br />CITY OF RAMSEY <br />ANOKA COUNTY <br />STATE OF MINNESOTA <br />AN AMENDMENT TO CHAPTER 117 OF THE CITY CODE, WHICH CHAPTER IS KNOWN AS <br />ZONING AND SUBDIVISIONS OF THE CITY CODE OF RAMSEY, MINNESOTA <br />AN ORDINANCE AMENDING DIVISION 6 SUBDIVISION II AND ADDING SUBDIVISION III <br />TITLED "ILLICIT DISCHARGE ELIMINATION" <br />The City of Ramsey Ordains: <br />SECTION 1 AUTHORITY <br />This ordinance is adopted pursuant to and under the authority of the City Charter of the City of Ramsey. <br />SECTION 2 AMENDMENTS <br />Section 117-388 is hereby amended as follows (additions indicated as underline. deletions indicated as <br />sic this ighA: <br />Sec. 117-388. — Inspections of the stormwater pollution control plan measures. <br />At a minimum such inspections shall be done weekly and after every storm event that is large enough <br />to result in runoff from the site by either the city, developer or the developer's designated representative. <br />(a) Maintenance is required as follows: <br />(1) When sediment reaches 1/3 the height of the BMP on perimeter control devices. sediment must <br />be removed within 24 hours. <br />(2) If the perimeter control device is not functional it must be repaired or replaced within 24 hours. <br />(3) Temporary sediment basins shall be maintained when sediment reaches %2 the outlet height or %2 <br />the basin storage volume. Basin must be drained or sediment removed within 72 hours. <br />(4) Construction site vehicle entrance and exit locations sediment must be removed from paved <br />surfaces within 3 hours of notification by City. <br />Sec. 117-389 (10) and (11) are hereby added to read as follows (additions indicated as underline): <br />(10)Knowledgeable person/chain of responsibility: As part of the SWPPP. the owner must identify a <br />person knowledgeable and experienced in the application of erosion prevention and sediment <br />control BMPs who will oversee the implementation of the SWPPP. and the installation. inspection <br />and maintenance of the erosion prevention and sediment control BMPs before and during <br />construction. The owner must identify in the SWPPP who will have the responsibility for long- <br />term operation and maintenance of the Permanent Stormwater Management System. The owner <br />shall include in the SWPPP a chain of responsibility with all operators on the site. or if not known. <br />the title or position of the responsible partv. to ensure that the SWPPP will be implemented and <br />
The URL can be used to link to this page
Your browser does not support the video tag.