My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 08/07/2014
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2014
>
Agenda - Planning Commission - 08/07/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:21:18 AM
Creation date
8/18/2014 9:38:06 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
08/07/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
An approved stormwater pollution controll j±n nuy be modified on vabn iazion of a written application for <br />modification to the city, and after written approval by the city engineer. In reviowing vacln neap ication, <br />the city engineer may require additional reports and data. <br />Appropriation of water from stormwater ponds for the purpose of private irrigation may be allowed based <br />upon criteria established by the City. City approval must be granted before use begins. <br />Section 117-399 is hereby amended as follows (additions indicated as underline. deletions indicated as <br />strike throughl: <br />Sec. 117-399. Records retention. Rain gardens in road right of way. <br />The city shall retain the written records of such modifications for at least five years. <br />In order to obtain a Right of Way permit. rain gardens constructed in the right of wav will be required to <br />capture street runoff. The property owner must agree to this condition and accept responsibility for <br />maintenance of the rain garden and associated features. <br />(a) If the homeowner is not agreeable to allowing street runoff into the rain garden they must agree to <br />install features that would direct all driveway runoff to the rain garden and capture 75% of front yard and <br />roof runoff. Maintenance of the rain garden and associated features will be the responsibility of the <br />homeowner. <br />(b) Rain gardens proposed for construction in the right of way must have plans approved by the City <br />Engineering Department. These plans will include illustration of area draining to the rain garden: design <br />details to prove proper sizing/capacity to handle the area of drainage: illustrate property boundaries. <br />location of street features. driveway. house and other structures in relation to the rain garden: and include <br />Proof of infiltration potential and ability to drawdown with in a 48 hour period. <br />(c) Rain gardens capturing street runoff would require a curb cut to direct flow into the rain garden. <br />Curb cuts for rain gardens approved in the right of way will be constructed and paid for by the City. All <br />other construction and maintenance associated with the rain garden is the sole responsibility of the <br />homeowner. <br />(d) City staff or designee has right of entry to all rain gardens in the right of way to ensure proper <br />function of the feature. <br />(e) Rain gardens in the right of way will be mapped as part of the City stormwater management <br />system. These features will be counted toward meeting compliance of the City's MS4 permit with the <br />State of Minnesota or other regulatory reauirements imposed on the City through state. federal or other <br />government agencies. <br />(f) The City of Ramsey shall have no liability for the rain garden or its associated features. <br />Section 117-400 is hereby amended as follows (additions indicated as underline. deletions indicated as <br />strike throughA: <br />Sec. 117-400. Financial securities. Mitigation provisions. <br />The applicant &Ix& p,ovide security for the performance of the work described and delineated on the <br />approved �� x- pan irrrnvixg the stormwater pollution contra plan and any stormwater and pollution <br />eontro11 yJran srclatcd remedial vrarik. The financial security shall be considered part of the Stage 1 <br />imprewinintz fo subdivisiorra. Fir`eicial securitioz izi i not be required for por it zn <br />in section 117 395. Security for permits not meeting these requiremont Lall be a mrnrn2um of the rate <br />
The URL can be used to link to this page
Your browser does not support the video tag.