Laserfiche WebLink
(b) Mitieation projects must involve the creation of new structural stormwater BMPs or the retrofit of <br />existing structural stormwater BMPs, or the use of a properly designed regional structural stormwater <br />BMP. <br />(c) Routine maintenance of structural stormwater BMPs already installed cannot be used to meet <br />mitieation requirements of this part. <br />(d) Mitigation projects shall be completed within 24 months after the start of the original construction <br />activity. <br />(e) The developer and the City shall determine. and document. who will be responsible for lone -term <br />maintenance on all mitieation projects of this part. Private mitieation projects shall have a binding <br />maintenance agreement recorded against the property. City maintained projects shall be covered by <br />Permanent easements. <br />(f) If the City receives payment from the owner and/or operator of a construction activity for mitieation <br />purposes in lieu of the owner or operator of that construction activity meeting the conditions for post - <br />construction stormwater manaeement. the City shall apply any such payment received to a public <br />stormwater project. <br />Section 117-401 is hereby amended as follows (additions indicated as underline, deletions indicated as <br />sic tht ugh): <br />Sec. 117-401. Notification of failure of the stormwater pollution control plan. Review. <br />The city z'hak .m.ify the developer, when the city i2 goiI g o act on the financial securiticr. part of this <br />subdivision. <br />(1) N tificati n by the city. The initial contact will becx1 a party listed on the applioatio . and/or the. <br />denrniy.ator pa atie. c tree r)/an. Fort- cigkt ko arse after notification by the city or 72 koarr after the. <br />failure of erosion control maWAIN u, vrMchever is less, the city, at discretion, may begin corrective <br />work. Such notification should be in writing, but if it is verbal, a written notification should follow as <br />quickly as practical. <br />(2) Erosion off site. If erosion breaches the perimeter of the site, the applicant ohaR immediately develop <br />a clenup aid restoration p? �, o n t the right of entry from the adjoii*g p operty owner, and <br />implement the clixanap an esto ation Aran within 1?, hoar, of cktainiIg tha-ad}oiniig prorcrty <br />otivncr'c- m ui iro.. In to case, unless writt✓n apprcrul is received from the city, ehak niorc than <br />seven calendar days go by without corrective action being taken. If in the discretion of the city, the <br />applicant does not repair the damage caused by the erosion, the city may do the remedial iwx'k <br />required and charge the cog. the applicant. <br />(3) Erosion into streets, wetlands or water bodies. If eroded soils (including tracked soils from <br />(1) <br />prcv✓ntion zimtegics, clAan rp an-spair nrazi be immediate. The applicant zlnak provide all traffic <br />control and required to protect the travo?in pth is during the cleanup operations. <br />Failure to do corrective work. When non npplicant fails to conform to any provision of this policy <br />within the time ziiprakttcd, the city may take the following actions: <br />a. Withhold the scheduling of inspections and/or the issuance of a certificate of occupancy. <br />b. Revoke any periit imaed by the city to the applicant for the site in question or any other of the <br />applionnt'zwtortwitkin th—eity'z jurrzdiction. <br />