My WebLink
|
Help
|
About
|
Sign Out
Home
Comprehensive Plan Update
>
Comprehensive Plan
>
Comprehensive Plan (old)
>
1990-1999
>
1995 (Approved)
>
1994 Land Use Study
>
Comprehensive Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 11:57:33 AM
Creation date
8/18/2014 12:38:56 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXECUTIVE SUMMARY <br />Based upon a premise of amending the Ramsey Comprehensive Plan, the Planning Commission <br />has been reviewing land use and transportation alternatives for several areas of the city. RLK <br />Associates and BIKO Associates have been assisting the Commission in a process that began <br />with a review of previous planning documents in January 1994. A subcommittee of the <br />Planning Commission was formed and land use and transportation alternatives were discussed <br />pertaining to the City in general and the Hwy. 10 corridor specifically <br />Between January and March the consultants worked with the subcommittee on alternative land <br />use scenarios, transportation corridors, and potential bridge locations. The subcommittee met <br />with the consultants and City staff on a monthly basis and the results of the study were <br />presented to the full Planning Commission on April 21, 1994. The Commission requested <br />modifications to the alternatives and a second review prior to forwarding any recommendations <br />to the City Council. <br />On May 19 the Planning Commission reviewed the land use and transportation alternative <br />scenarios for a second time. The Commission then directed the consultants to prepare a final <br />set of alternatives and recommendations to be presented at a joint meeting of the Commission <br />and Ciry Council. The Commission also directed staff and the consultants to confer further <br />and, if desired, prepare an additional alternative to reflect any issues that staff felt may require <br />further attention. <br />This report comprises the eight alternatives that have evolved out of the planning process. <br />These alternatives are intended to form the foundation of amendments to the City of Ramsey <br />Comprehensive Plan. <br />Alternatives recommended to the City Council by the Planning Commission include: <br />Figure 1 <br />Figure 2, option C <br />Figure 3 <br />Figure 7 <br />Each of these recommended alternatives are explained further in this report. The other <br />alternatives for the Hwy. 10 corridor —Figures 4, 5, and 6—are not recommended by the <br />Planning Commission. They are presented and explained in this document to provide <br />background information. <br />
The URL can be used to link to this page
Your browser does not support the video tag.