Laserfiche WebLink
MEMORANDUM <br />DATE: June 1, 1994 <br />TO: Ryan Schroeder, City Administrator <br />Steven Jankowski, City Engineer <br />Sylvia Frolik, Zoning Administrator <br />Steve Swanke, Consultant <br />FROM: James Gromberg, Economic Development Coordinat <br />RE: Comprehensive Land Use Plan Update <br />I have completed the attached comparative table of the possible options for the updated Land Use <br />Plan. Based upon this chart, all of the options supply the City with over 350 years of <br />commercial/industrial property. Tne method for these figures is as follows: <br />35% cover of each acre of commercial/industrial property <br />33,953 square feet of commercial/industrial space constructed each year. <br />Five-year average between 1989 - 1993. <br />This five-year period could be at the low point of commercial/industrial building construction. If <br />this is the case, the average would have to be increased ten times. These numbers would change <br />to: <br />Option 4 <br />38 years <br />Option S Option 6 Option 7 <br />50 years 41 years 48 years <br />Since this plan is still in the review stage, the City may want to consider the option of reducing the <br />amount of commercial/industrial property by one-third.. This reduction would allow for the Ciry to <br />have between 254 years and 330 years if the current five-year average holds ti ue. If this average is <br />low, and projected building in 1994 and 1995 is over 250,000 square feet, then these numbers <br />could be reduced quite substantially. <br />Tne properry that is rezoned should be used to supplement the single family zoning as this appears <br />to be somewhat under represented with a build -out of the following rates: <br />Metropolitan Council <br />5 Year Average <br />3 Year Average <br />Estimate <br />180 per year <br />205 per year <br />271 per year <br />Existing Op. 4 Op. 5 Op. 6 Op. 7 <br />7 years <br />6 years <br />5 years <br />13 years <br />11 years <br />8 years <br />9 years 9 years 7 years <br />8 years 8 years 6 years <br />6 years 6 years 5 years <br />Since the comprehensive plans are generally updated every 10 years, the supply of property for <br />build -out should be longer than the 10-vear period to allow for continued development. This <br />analysis does assume that there would be limited, multiple family developments and these units are <br />not subtracted for the projected units absorbed. If the past rate of construction is any indication, <br />than the City builds an average of 5.4 units per year. This average is probably very low due to <br />past market indications. As a greater demand for multi -family housing increases and the economy <br />improves, the City may see a greater need and a higher building rate for these units. <br />3Q' <br />